China Southern Cargo Opens Pudong-Miami and Pudong-Amsterdam-Oslo Freighter Loops From Oct 25
2026-10-26
Qatar Airways Cargo Winter Freighters: 100t Copenhagen Oct 25, 435t Poland, 226t JFK Nov 1
2026-10-25
TD Cowen/AFS Index: Parcel, LTL and Truckload Costs All Set Q4 Records on Fuel and Capacity
2026-10-24
U.S. Rail Intermodal Up 12.6% in Week 41 as Diesel and Truck Capacity Push Freight onto Rail
2026-10-22
Saudi air cargo capacity drops 33% in three days: Riyadh space falls from 3,925 to 26 tonnes
2026-10-14
Wuhan Opens 15-Day Rail Link to Ulyanovsk, Taking Auto Parts Into Russia's Industrial Belt
2026-10-11
AFKLMP Winter Map: 14 Freighter Cities, Tri-Weekly Cairo 777F, Navi Mumbai Switch From Oct 25
2026-10-08
Trans-Siberian backlog lifts Busan-Vladivostok rate to $1,700/TEU; rail waits top one week
2026-10-07
Cathay and Cargolux indefinitely postpone Middle East freighter restarts, pinching capacity
2026-09-08
China-Europe rail from Xi'an ships 34,000 cooling appliances to Europe in 12 days vs 40 by sea
2026-08-30
Ethiopian Cargo opens Chengdu-Addis Ababa B777F route, first southwest China-Africa freighter link
2026-08-28
Baltic Dry Index jumps 4.4% to 3,056, fifth straight gain, as capesize earnings hit $42,148
2026-08-26
Xeneta: US East Coast imports cost $3,334/FEU more than West Coast as spread beats pre-war rate
2026-08-25
Drewry counts 49 blanked sailings on east-west trades for weeks 35-39, 60% on transpacific
2026-08-21
Asia-North Europe capacity set to rise 2% to 101 vessels as Long Beach queues hit 25.3 ships
2026-08-20
Asia-Pacific Air Cargo Spot Rates Slide for Fifth Straight Week as China-Europe Lane Cools
2026-08-04
Union Pacific and Norfolk Southern file final STB response with unprecedented shipper protections
2026-07-27
GEODIS Successfully Trials Recyclable Paper Thermal Covers for Pharmaceutical Airfreight Cold Chain
2026-06-25
US Truck Spot Rates Hold $3.81/Mile as DAT Load-to-Truck Ratio Climbs to 6.2:1 in Latest Read
2026-06-24
Chiongbian Family to Reacquire Full Ownership of FAST Logistics in Philippine 3PL Consolidation
2026-06-22
UAL and Vertom Forge Strategic Maritime Logistics Partnership for Breakbulk and Project Cargo
2026-06-21
U.S. Diesel at $5.35/Gallon Drives TL Fuel Surcharge to $0.70/Mile, Adding $150 Per Standard Load
2026-06-18
GXO Signs Multi-Year Logistics Agreement with L'Oreal Across Czechia, Slovakia, and Hungary
2026-06-15
Amazon Freight Opens LTL Network to All Shipper Tiers, Pressuring ArcBest, Old Dominion, and XPO
2026-06-13
WSJ Reports Four-Year U.S. Trucking Slump Is Finally Over, Marking Tonnage and Pricing Inflection
2026-06-13
ArcBest and ABF Freight Announce Mid-Cycle 5.9% LTL Rate Increase, Breaking Annual Pricing Tradition
2026-06-12
U.S. Rail Freight Surges 7.8% Year-over-Year as Intermodal Volume Climbs 13.6% for Week 22
2026-06-11