Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 12 May 2026, list every air shipment booked for June and July with its chargeable weight, tender size and cutoff, and mark everything under 500 kilos as a consolidation candidate.
- Before 22 May 2026, merge the bottom third of those tenders into fewer, denser shipments, and get written confirmation from the forwarder that the surcharge is charged per shipment rather than per kilo, so the saving is real and not arithmetic.
- Set 1 June 2026 as a hard booking date for retail-season volume, with a named flight or a named allotment per lane, rather than a rate target that nobody can enforce.
- For semiconductor and other high-value lines, price the surcharge against cargo value instead of freight spend, and reject any lane where a missed named flight costs more than a month of surcharge.
- Review the air-versus-ocean split on every SKU with more than 30 days of cover on hand, and move the slow-moving share to ocean before the pre-peak bump, keeping air only for the items where a late arrival actually costs a sale.
Air Cargo News reports intercontinental air-freight rates eased from post-Lunar-New-Year highs but remained above prior-year levels as e-commerce and semiconductor flows sustained demand. Capacity from belly and freighter fleets is ample, yet surcharges on peak lanes persist. Forwarders expect a pre-peak bump ahead of the retail season.
The Analysis
Air freight rates came off the Lunar New Year highs and are still above where they sat a year ago, which is the sort of sentence that gets filed under good news and then never read again. Air Cargo News reports the easing came with e-commerce and semiconductor flows still holding demand up, belly and freighter capacity ample, and surcharges on peak lanes still in place. Forwarders are already talking about a bump ahead of the retail season.
Three of those clauses sit badly next to each other. Ample capacity, persistent surcharge, a year-on-year comparison still running high. If there is space on the aircraft, why is there still a surcharge, and why would anyone expect price to firm again before the retail build?
The answer is on the ground rather than in the air, and it decides whether your May booking turns out cheap or expensive.
Follow a pallet. It leaves your dock on a truck, arrives at the forwarder's shed, gets screened, gets built into a ULD or a pallet, gets tendered to the airline before a cutoff, gets ramped, gets flown. Every step before the aircraft has a fixed number of positions per hour and a fixed cutoff, and none of those numbers grow when a widebody is added to the schedule. The aircraft is the visible capacity. The buildup door, the screening line and the cutoff clock are the capacity you actually buy.
That is how a market can be loose and expensive at the same time. Belly capacity is a byproduct of the passenger schedule: it exists in the total the network flies, but it arrives at the hub at the hours passengers want to fly, in the directions passengers want to go. Cargo does not pick those hours. A factory releases on a Thursday afternoon; the widebody with the empty belly may leave on Thursday morning. Freighter capacity can be chartered around that mismatch, but the shed's buildup positions and the cutoff windows cannot be chartered, because a building and a shift set them. So the scarce item in a pre-peak market is not a tonne of lift. It is a departure window that lines up with a release, plus a slot on the buildup floor to make it.
The surcharge is the price of that window, which is why it survives a soft base rate. The base rate prices distance and weight. The surcharge prices timing and position. The two can move in opposite directions without contradicting each other, and this spring they are: the index eases, the invoice does not. An importer who reads the index and expects the invoice to follow will forecast the wrong quarter, and will then spend June explaining the gap to a finance team that has already seen the number in the trade press.
The layers separate by density rather than by size. E-commerce parcels are light for their volume and tender in small lots, so a peak-lane surcharge lands on a low chargeable weight split across a high number of shipments, and the effective cost per kilo climbs. Semiconductor freight is dense, expensive and usually tendered in fewer, bigger, better-built shipments; the same surcharge is a rounding error against the cargo value, and what that shipper is buying is not speed but the certainty of a named flight. A small forwarder without a blocked allotment feels it as space that disappears on the day the retail buyer calls. A large forwarder with a charter or a hard block feels almost nothing and quietly reprices the spot space it holds. One market, three different problems, and the rate commentary describes none of them.
Timing here is a booking-window story, not a rate story. Rates ease when the post-holiday lull clears the backlog, and then the pre-peak bump arrives not because tonnage suddenly doubles but because everyone tries to book the same two or three weeks. The report flags that bump ahead of the retail season; the operational version is that space stays ample until the day it is not, and it stops being ample in days rather than weeks. For a shipper building toward a retail window, the booking decision in the first half of May sets the price paid in June. Miss the window and you are not negotiating a rate, you are bidding for a slot.
The part that never makes the rate commentary: with capacity described as ample, the constraint that will bind you is the number of tenders you can push through a shed before cutoff, and that number is a function of how you build the pallet, not how much you are willing to pay. Consolidating three thin tenders into two dense ones cuts the fixed cost per shipment, cuts handling and screening touches, and buys a better chargeable-weight position, all without negotiating a cent. It also adds dwell, because you hold cargo for the second day. That trade has a break-even and almost nobody calculates it, because arguing about the rate sheet is easier than changing the buildup plan. The second half of this is less comfortable. A buyer who consolidates is buying certainty with time, and time is the one input the retail calendar does not lend you. So the consolidation only pays on lanes where your release pattern is predictable enough to fill the second day.
Wait for the rate to normalize and you book into the bump with the same tonnage and fewer choices; the surcharge you avoided becomes the surcharge you pay, plus whatever premium the rush adds on top. Split the shipment to chase a cheaper per-kilo rate and you pay it back in handling, screening and minimum charges, and you hand the airline a tender that fits no ULD particularly well. Leave the build alone and the market prices your indecision at the cutoff, which is the one deadline in air freight that does not move.
A small account on my assumptions, since the report publishes no absolute rates. Take 12 tonnes a month on one peak lane, tendered as 15 shipments of roughly 800 kilos. Assume the peak-lane surcharge carries a minimum per shipment equivalent to 250 dollars, which is my assumption and not a published figure. Fifteen shipments is 3,750 dollars a month in surcharge alone. Consolidate to 10 shipments of 1,200 kilos and the same tonnage pays 2,500, a saving of 1,250 a month with no rate conversation at all. The cost is dwell: two extra days of holding per consolidated tender, which is real money if the cargo is financing-sensitive and close to nothing if it is not.
Book the window, then fix the build. An airline will sell you space; nobody will sell you a better pallet, and the pallet is where the surcharge is actually decided.
↑ Back to the key points