Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- Treat the December release as a peak confirmation rather than a forward signal, and set your January air negotiation off belly and freighter capacity data, not off the year-on-year demand line.
- During the January trough, negotiate a shorter validity with a re-open clause if you cannot secure a rate floor, so a spring belly cut does not leave you locked at a level the market has left behind.
- Model the two outcomes: at 150 tonnes and $4.60 a kilogram, a 4% easing saves $27,600, while a 7% spring reversal adds $48,300, a swing of roughly $76,000 tied to your signing date.
- On freighter-dependent and out-of-gauge lanes, secure peak space in the first quarter instead of assuming any easing will reach you, since utilisation is high and there is no slack.
- Set a monthly review from February that pairs freighter utilisation with the published passenger schedule, and raise your belly-reliant allocations the moment a frequency cut appears.
IATA reported global air cargo demand rose year-on-year in December, driven by cross-border e-commerce and semiconductor shipments. The body said yield pressure eased as belly capacity returned, though freighter utilisation stayed high.
The Analysis
IATA reported global air cargo demand up year on year for December, again with cross-border e-commerce and semiconductor shipments as the drivers. The body said yield pressure eased as belly capacity returned, and that freighter utilisation stayed high.
December is the month to read that release differently from the rest of the year. A December print lands in the middle of peak, when the space you booked in August is finally being flown, and it tells you almost nothing about what January will cost you. For that you have to look at what December did to the forward book.
If you are about to sign next year's air agreements, the December read is the last clean input you get before the January resets.
Read the release for what it measures. December demand up year on year is a statement about a month that was sold out two quarters earlier, so it is a confirmation, not a signal. The drivers named are the same two groups that set air cargo's pace all year: cross-border e-commerce, which buys transit time because a day late is a refund, and semiconductors, which buy it because the chip outweighs the freight by a wide multiple. What matters in December is not that demand was up but that the capacity story underneath it was splitting.
The mechanism is the belly-versus-freighter split, and December is where it shows most clearly. Belly capacity came back because the passenger networks fly their fullest schedules into the year-end, and every one of those seats brings cheap tonnage with it. That is why yield pressure eased. Freighters ran at high utilisation because the cargo that could not wait for a belly hold went to them. So December hands you two markets at once: a softening average driven by belly-heavy lanes at their seasonal peak, and a fully booked freighter market where the utilisation number is the warning light.
Who this lands on. The shipper whose peak freight is heavily belly-carried exits December with a softer average and a good position to negotiate. The shipper on a freighter or charter-dependent lane, say anything oversized, dangerous goods or time-critical, exits December paying peak rates with no sign of relief, because high utilisation is the opposite of slack. The e-commerce seller has mostly locked their peak months already and is watching January rates, which is the right instinct. The general cargo shipper on an e-commerce dominated trade lane is the quiet casualty: they compete for the same hold with block space agreements signed months ago, and the easing in the average never reaches them. The mid-size shipper with no block space agreement and no volume to earn one is exposed in the same way, buying at spot on lanes where the softness has not landed.
The timing point is specific to a December print. What you are reading is a backward-looking confirmation of a peak that is finishing, published when the market is about to empty out. The useful move is not to act on December but to use December's evidence to set the January negotiation. Here is the part nobody prints: the January trough is when carriers are willing to give you terms, and it is also when the belly capacity you depend on can be cut at the next schedule change, because passenger demand falls after the holidays. You are negotiating a rate in a soft moment for a market that will be structurally tighter by spring, and the average will have misled you exactly at the moment you signed.
Give it numbers so you can check the logic. Assume you fly 150 tonnes across the year with a heavy fourth-quarter peak, and your blended rate is $4.60 a kilogram, which you should swap for your own contract figure. That is $690,000 a year. If the belly-driven easing gives you 4% off in the January negotiation, you save $27,600 over the year. If you sign then and belly capacity is trimmed in the spring schedule, sending your rate back up 7% instead, the same 150 tonnes costs $738,300, which is $48,300 more than the easing case. The gap between those two signatures, roughly $76,000, is what the timing of a January deal is worth.
What flips it. If passenger networks hold their winter frequencies longer than usual, belly stays cheap into spring and the soft January rate you signed stays good. If e-commerce demand stumbles, the premium segment thins and averages fall further, again in your favour. Against that, the risk is concentrated in one line: freighter utilisation staying high means there is no cushion, so any capacity loss, a schedule cut, a fuel move or a new lane of urgent demand, transmits into spot prices fast. Watch the freighter utilisation number and the next passenger schedule together. A third condition is your own lane mix: if your peak uplift rides on a single trade lane, a frequency cut on that lane is a larger risk than any market average, so confirm the winter plan with your forwarder before you sign. The trap with a December release is treating a peak confirmation as a forward price signal, and signing a twelve-month deal on it.
↑ Back to the key points