Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- This week, split ninety days of freight invoices into linehaul and accessorials; if accessorials exceed 10 percent of the total, audit them line by line before you open any rate discussion.
- Ask your top three receiving DCs for their current appointment lead time in days; if it has grown by two days or more since the autumn, treat capacity as tightening whatever the index says.
- At your next renewal, negotiate the accessorial schedule explicitly: detention free time, chassis, appointment and no-show charges, waiting time; a fixed detention clock is worth more than a two percent linehaul cut.
- Measure trailer dwell at your own dock weekly and hold it under two hours, because that is the number that decides whether a carrier gives you a truck in a month when trucks are short.
- Keep 5 to 10 percent of monthly volume on the spot market through the first quarter, so the carrier who already knows your dock is the one you call when the appointment calendar closes.
The Cass Freight Index showed US freight expenditures stabilised in December after a long soft patch, with shipments also edging up. Cass said the inflection reflects stabilising inventory cycles rather than a demand boom.
The Analysis
The Cass Freight Index says US freight expenditure stabilised in December after a long soft patch, with shipments edging up, and Cass is careful to call the inflection a stabilising inventory cycle rather than a demand boom.
Read that again with the physical part in mind. Expenditure flat, shipments up slightly. That is not a market getting busy. That is a market where the price per shipment is still soft while the number of shipments has stopped falling, which describes a network that has been thinned out to match the soft months.
An index that stops falling is not a warning about price. It is a warning about slack.
The distinction Cass draws is the whole story, and it is worth taking seriously rather than treating it as a hedge. A demand boom shows up as shipments rising faster than expenditure, with rates chasing volume. A stabilising inventory cycle shows up as shipments flattening while expenditure flattens with them, because the replenishment rhythm has settled into a repeatable cadence and nobody is rebuilding stock in a hurry. What that means on the ground is that freight is becoming predictable again, and predictable freight is the kind that gets planned into a schedule rather than fought for at the last minute.
Predictability sounds like good news. For the shipper who plans, it is. It is also the condition under which everyone who was bleeding through the soft patch finishes cutting.
The soft patch was long, and long soft patches do a particular kind of damage. Carriers do not park capacity politely: they park the oldest tractors, they let owner-operators drift away, they stop recruiting, and they consolidate terminals into fewer doors with shorter hours. Shippers do the same thing from the other side. Receiving hours get trimmed to protect labour, appointment windows get narrower, and the second shift at the DC quietly disappears. None of that appears in a freight expenditure index, because the index measures what was paid, not what was given up.
So the network that produced a stabilising December is a network with fewer drivers, fewer doors and tighter receiving windows than the one that entered the soft patch. The stabilisation is real. So is the loss of slack, and the loss of slack is what you meet when volume comes back by five percent and the appointment calendar has not moved at all.
Size decides who absorbs that. A shipper moving three hundred loads a month has a carrier relationship, a routing guide, and somebody whose job is chasing appointments; they will feel the tightening as a cost line. A shipper moving twenty loads a month has none of that, takes the appointment that is left, and pays for the squeeze in detention charges nobody audits. Trade direction matters here too, though less than people assume: this is a US freight measure, so an exporter shipping into the US meets it at the drayage end, where chassis and terminal appointments are the binding constraint, while an importer meets it at the DC door, where a missed window costs a day and a rescheduling fee.
The one who barely notices is the shipper whose freight moves full truckload on contract, with a fixed appointment slot and enough volume to defend it. That shipper experiences the whole cycle as a rate conversation, which is exactly the wrong lesson to take from this index.
When this arrives is not December. December is the measurement. The consequences land in the first quarter, in two places at once. Contract renewals happen in the first quarter, and a carrier that has been absorbing a soft market arrives with a schedule of accessorials rather than a linehaul number, because accessorials are recoverable without a public rate increase. The appointment squeeze arrives with the first seasonal volume push, when the DCs that trimmed their receiving hours discover they never added them back.
Which is the part the index does not say. Expenditure per shipment staying soft while shipments edge up means yield per shipment is falling, and a carrier whose yield is falling does not wait for the market to fix it. It fixes it on the lines the customer does not read: detention free time, chassis fees, appointment and no-show charges, waiting time. Those lines move before the linehaul rate does, they are negotiated by nobody, and they are approved by everybody who signs the invoice without opening it. If you want an early read on this cycle, do not watch the index. Watch the accessorial share of your own freight spend.
Assume three hundred loads a month at an average invoice of 2,400 dollars, which is my assumption and not a figure from the release. That is 720,000 dollars a month. Assume accessorials normally run at 8 percent of freight spend and drift to 12 percent before the linehaul rate moves at all. Four points on 720,000 is 28,800 dollars a month, and it arrives without a single negotiation. Now price the alternative: a hard two percent linehaul discount on the same spend is 14,400 dollars. The accessorial drift costs twice what the rate negotiation saves, and the rate negotiation is the one that gets a meeting.
The number that matters is not the 28,800. It is the ratio, because the ratio is stable across most shippers and it tells you where to spend the quarter.
The counterfactual is a market that keeps falling instead of stabilising. In that world, waiting is correct: you hold your volume loose, you let the carrier come to you, and every quarter of delay buys a better price. That is what the last several quarters trained everyone to do, and it is why the reflex now is to read a stabilising index as an invitation to wait a little longer. The reflex is pointed the wrong way. A flattening index with shipments edging up is where the waiting trade stops paying, because the capacity you are waiting to buy cheaply is being withdrawn while you wait.
If the inventory cycle stalls instead of stabilising, the whole reading reverses, and the accessorial drift becomes a bargaining point in your favour rather than a cost to contain. That is the condition to watch, and it is a shipments question, not an expenditure question.
The pit in this cycle is negotiating the line that is not moving. Everybody brings a rate benchmark to a renewal, and in a quarter like this the benchmark is the least informative document in the room, because the linehaul number is being held flat on purpose while the cost migrates to the schedule at the back of the contract.
Today, pull ninety days of invoices and sort the accessorials by line. You will know within an hour whether this quarter is a rate conversation or a schedule conversation, and you cannot negotiate the second one with the vocabulary of the first.
↑ Back to the key points