Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 10 April 2026, select the two lanes with the widest delivery windows and start a four-week trial conversion capped at 20 percent of monthly volume, so dwell is measured before anything is scaled.
- By 17 April 2026, obtain written ramp dwell and chassis free-time terms from the dray carrier and the ramp operator, and record the per-diem start point lane by lane, because that day is the real break-even line.
- By 24 April 2026, set a 95 percent appointment compliance target at the receiving dock and name one owner for ramp scheduling, so the queue has a person attached instead of a complaint.
- By 8 May 2026, price the return leg on every converted lane including empty repositioning, and drop any lane where all-in cost is not at least 5 percent below the truckload alternative.
The Association of American Railroads reported US intermodal volumes rebounded in early April as importers shifted mode to manage costs. The group said domestic and international units both posted gains, signalling broad restocking.
The Analysis
Intermodal volumes in the United States turned up in early April. The Association of American Railroads says domestic and international units both posted gains, and the read-through is that importers moved freight off the highway to hold cost down.
The number is real, and it is also a queue notification. Every box that leaves a trailer for a rail car has to be lifted at a ramp, dropped on a chassis, pulled by a dray truck and gated back out. The association counts the units. Nobody counts the waiting.
I have spent enough afternoons at Midwest ramps to know what a volume rebound looks like before it reaches any index. The appointment board fills two days out, the chassis pool goes thin by mid-morning, and the line at the gate at six is the honest answer.
Start at the water and walk the box inland. It comes off the vessel, gets grounded or goes straight onto an on-dock rail loading track, rides a stack train to a ramp three hundred miles inland, gets lifted onto a chassis, sits until a dray truck with an appointment shows up, and then fights traffic for the last forty miles to a distribution centre. Six handoffs. Five of them are physical, and four of them are somebody waiting for somebody else.
The rebound is a demand signal arriving at a step with fixed capacity. A ramp has a number of lifts per hour, a number of track spots, a gate that opens and closes on a schedule, and a chassis pool sized for an ordinary Tuesday. None of that expands because importers decided to save money on the linehaul. And when domestic and international volumes rise together, they are not rising in two separate systems. They are rising on the same lift, the same gate crew, the same asphalt.
That is where the money leaks. The linehaul saving is visible on a rate sheet, so it gets approved quickly. The cost that arrives later is dwell: the box sits on a chassis because the dray carrier could not get a slot, the free time runs out, and the per-diem clock starts. The other cost is the return leg. An international container that goes inland by rail has to come back, and with no backhaul cargo it comes back empty, and somebody pays the repositioning. Usually the same importer, in a charge that lands three weeks later with a reference number nobody recognises.
The impact is not evenly spread. A small importer moving a few dozen containers a month has no ramp contract, no chassis pool of its own and no leverage on drayage, so it takes the queue at spot and pays the dwell. A mid-size importer with a warehouse within fifty miles of a ramp can genuinely convert, because the dray leg is short and the variance is survivable. A large cargo owner with a dedicated train and its own chassis arrangement barely notices the rebound, and in a tight drayage market it may actually gain, because carriers keep its trucks turning and park everyone else in line. Direction matters as much. An importer pulling inland competes with domestic fifty-three-foot flows for the same lift. An exporter pushing boxes toward the coast competes for the return capacity, which is the cheaper direction and the first one sacrificed when the ramp fills.
You will feel this in a sequence, and the sequence is predictable. The weekly rail figures move first, which is the part you read about. Ramp dwell moves second, usually two to four weeks behind, because that is how long it takes for the appointment book to fill and the chassis pool to thin. Drayage pricing moves third. The invoices for per-diem and repositioning move last, thirty to forty-five days out, which is exactly why the decision looks smart in April and the quarter closes badly in June.
Here is what the volume number cannot tell you. It counts units, not turns. A ramp handling the same box count with double the dwell is a ramp in trouble, and the weekly series cannot see the difference. It also cannot separate a mode shift from a restocking wave, because in a monthly total the two look identical. If the gain is restocking, it fades. If it is a permanent switch, the ramp constraint tightens every quarter until somebody builds or reopens capacity. Do not build your plan on which one it is. Build it on the fact that both cases put you in the same queue for the next two quarters, and that the queue is the exposure, not the rate.
Run a small number. These are my assumptions for illustration, not figures from the association or any carrier tariff. Take an importer moving 180 containers a month, with 40 percent converting to intermodal, so 72 boxes. Assume the inland move used to sit two days at destination before pickup and now sits four, and that free time covers two of those days. That is 144 box-days a month of extra chassis and per-diem exposure. At an assumed 60 dollars per box-day, that is 8,640 dollars a month, roughly 104,000 dollars a year, against a linehaul saving that may well be smaller. Add the missed appointments and the receiving dock that has to rebook, and the arithmetic gets worse rather than better.
The counterfactual is worth stating plainly, because it is the trap. If you do nothing and stay on the highway, you keep paying the truckload market, which is not falling this week. If you convert and change nothing else, you buy a linehaul saving and a dwell problem, and the dwell problem lands on the receiving dock, which has no budget line for it. If you convert and also fix appointment discipline, the chassis arrangement and the return leg, the saving is real. The difference between the second case and the third is not the mode. It is whether anyone owns the ramp interface.
The mistake I see most is converting a lane that cannot tolerate variance. Intermodal is a schedule product with a wide distribution, and if your promise to the customer is a date rather than a week, the variance eats the saving. The next mistake is treating the dray carrier as a commodity while the ramp is congested. In a queue, the carrier with ten trucks and a working relationship at the gate gets the slot, and the cheapest bid does not.
Pick one lane this week, the one with the widest delivery window and the steadiest volume, and put a person's name against the ramp interface. That is a Wednesday afternoon job, not a project.