Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- Before the end of this week, write down the acceptance cut-off for every departure you use, and work backwards to a factory loading time that leaves a two-hour buffer before the queue starts.
- For your top ten SKUs, ship one day earlier for the next eight weeks so that a missed cut-off costs a day of buffer rather than a customer promise.
- Ask your forwarder for a confirmed acceptance slot, not just a flight booking, and refuse to count a shipment as booked until the slot is named in writing.
- Track the share of consignments handed over before the cut-off weekly; if it falls below 95%, move the factory loading time earlier by one hour for the following week.
- For high-value or semiconductor cargo, secure a named pallet position on a freighter two weeks ahead, and keep a second routing approved so a missed flight does not require a new decision.
IATA reported global air cargo demand rose 5% year-on-year in February, driven by cross-border e-commerce and semiconductor shipments. The body said yield pressure eased as belly capacity returned, though freighter utilisation stayed high.
The Analysis
IATA reports global air cargo demand up 5% year on year in February, carried by cross-border e-commerce and semiconductor shipments. The same report says yield pressure eased as belly capacity came back, while freighter utilisation stayed high.
Two sentences, and they describe two different markets. The 5% is a demand number, and demand is the easy half. What decides whether your consignment moves tonight is a dock door, an X-ray machine and a build-up table, all of which were sized for last year's flow and none of which grew by 5%.
Air cargo does not congest in the air. It queues on the ground, in a window of a few hours, and the queue is ordered by something other than who arrived first.
Hold the four facts together before reading anything into them. Global air cargo demand was up 5% year on year in February. The growth came from cross-border e-commerce and semiconductors. Yield pressure eased as belly capacity returned. Freighter utilisation stayed high through all of it.
The chain runs through the composition of the cargo, not the size of it. E-commerce is parcel-dense. It arrives as thousands of small pieces that each need to be received, screened, sorted and built onto a pallet, and the work per kilo is many times that of a palletised industrial shipment. Semiconductors are the opposite: low weight, high value, usually palletised, often temperature or shock sensitive, and they clear the ground stage quickly because there is so little of them to handle. Put those two in the same 5% and you have a demand figure that says nothing useful about workload, because the workload grew far more than the tonnage did.
That is where the physical constraint sits. Aircraft are not the bottleneck on a normal night; freighters were already running full, which the report says outright, and belly space comes and goes with passenger schedules rather than with your order book. The bottleneck is the acceptance window at the terminal: the hour by which your cargo must be handed over, screened and built before the flight is closed out. That window has a fixed throughput. It is staffed by a fixed number of people, it runs through a fixed number of screening machines and build-up positions, and none of that scales with a 5% demand increase in a single month.
Follow a truck in. It leaves the factory when production finishes, not when you would like it to. It arrives at the terminal, and if it arrives inside the last two hours of the acceptance window along with everyone else, it joins a queue that is measured in pallets, not in kilometres. Behind the queue is a cut-off that does not negotiate. Miss it and the cargo does not leave late by an hour; it leaves on the next flight, which for a nightly service means tomorrow, and for a twice-weekly freighter means the day after that.
Size and cargo type decide who gets hurt. A semiconductor shipper is largely insulated, and it is worth being honest about why: few kilos, high revenue per kilo, and a ground handler will always find a slot for that. An e-commerce seller with daily parcel flow is not insulated at all, because the flow is continuous, the volumes are large, and the per-kilo revenue is low. A large platform seller can block space and pre-book screening capacity; a small seller riding a consolidator's consolidation inherits whatever position the consolidator was given, which in a tight week is the last one.
Direction splits it too. Outbound from Asia, where both e-commerce and semiconductor production concentrate, the constraint is the acceptance window and the build-up table. Inbound into Asia or on North Atlantic legs, the returning belly capacity is doing the most work, so the pressure is lighter and the easing is real. A shipper importing into Asia from Europe will read this report and find it describes somebody else's month.
Count the lag in hours, not days. The pressure shows up at the acceptance cut-off, which is a nightly event. Between the cut-off and the flight there is nothing you can do. Between the factory door and the cut-off there are a few hours in which a truck can be resequenced, a pallet can be split, or a consignment can be moved to a later flight deliberately instead of being bumped accidentally. That is the only part of the day where you have any agency.
Here is the part of the report that gets read backwards, and it is the reason I would not plan on the word easing.
Belly capacity returning is good news for the cargo that can use it. Belly space sits inside passenger aircraft, which means it is available at passenger timings, at passenger airports, and in the unit sizes a passenger operation can handle. It is typically sold in blocks to consolidators rather than piece by piece to individual shippers. So the yield relief described in the report reaches the market as cheaper consolidation on trunk passenger routes. The cargo that grew by 5%, meanwhile, is e-commerce parcels and semiconductors, and a large share of that moves on freighters, whose utilisation the report says stayed high. The average yield fell. Your rate on the flow you actually ship may not have moved at all. Two true statements, one misleading average.
The second thing nobody puts in the press release is the ordering rule inside the terminal. When several flows compete for the same fixed acceptance capacity, the ground handler allocates dock doors, screening slots and build-up positions by revenue per kilo, and by how much disruption a missed flight causes to the customer relationship. E-commerce ranks low on the first measure and high on the second, because a missed parcel is a customer complaint, and semiconductors rank high on both. So the segment that produced the growth is the segment that waits. That is not a scandal, it is arithmetic with a queue in front of it, and it is entirely predictable once you know the rule.
Put numbers on it, marked as mine rather than the report's. Assume six trucks a night arrive at your terminal, three tonnes each, eighteen tonnes in total, against an acceptance throughput of twenty tonnes across the whole window. You look comfortable. Now assume two of those trucks are loaded on the same factory shift and therefore arrive inside the same two-hour window, six tonnes against a two-hour screening capacity of six tonnes. Demand grows 5%, so those two trucks now carry 6.3 tonnes. The overshoot is 0.3 tonnes, which sounds like nothing, except that cargo does not leave in fractions. It leaves in pallets of one and a half to three tonnes, so a 0.3 tonne overshoot costs one pallet, and one pallet can be an entire customer order. Every number in that example is my assumption, not a figure from the report.
The fix is not more space. It is spreading your own arrivals across the window instead of letting the factory decide. Stagger the loading times, book the acceptance slot rather than the flight, and treat the cut-off as the deadline that matters, not the departure time on the itinerary.
The trap is treating the departure time as the commitment. Your customer does not care what time the aircraft pushed back; they care what day the goods cleared. A consignment accepted with forty minutes to spare and a consignment accepted four hours early leave on the same flight, but only one of them survives a queue. Build the day backwards from the cut-off, subtract the queue, subtract the drive, and tell the factory what time the truck has to be loaded. If that number is uncomfortable, it is supposed to be.