Sea Logistics Volume Steady as Contract Talks Progress

Source: Kuehne+Nagel · 2026-03-17 · 7 min read
中文

Supply Chain Action Points

Read this first — the conclusion, and the moves to make:

  1. Before you sign, get the weekly split in writing as FEU per week per vessel string; an annual commitment without a weekly distribution is decoration, and you should treat it as such until the number is on paper.
  2. Build a one page allocation ledger this week covering booked, gated in, loaded and rolled by week, review it every Monday at 09:00, and set a roll ratio target below 5 percent.
  3. Book the first eight weeks after signature before you sign, on the terms you already have, so the transition has no gap week where nobody owns your cargo.
  4. Confirm empty container release separately ten days before cargo ready date and name a backup depot within 80 km; equipment is the gate that fails first at month end, not vessel space.
  5. For every month end sailing, book the terminal appointment at least 72 hours ahead and keep a 24 hour buffer before cutoff, because the last working day is when the book fills and the depot empties.
Skip to the detailed analysis ↓
Summary

Kuehne+Nagel reported steady sea logistics volume as annual contract talks progressed. The forwarder said visibility tools helped customers protect allocations amid tightening capacity.

The Analysis

Kuehne+Nagel reports steady sea logistics volume while the annual contract talks grind on, and says its visibility tools helped customers hold their allocations as capacity tightened.

Steady volume during contract season is the most misleading number in this business. It is an average of two completely different experiences: the shipper whose boxes sailed, and the shipper whose boxes were rolled. When a market tightens and the total does not move, nothing was added. Something was taken from somebody and given to someone else.

The volume number is the report. The allocation is the fact. And the allocation is not real until a box is hanging from a crane.

Read the three claims together, because separately each one is harmless. Volume held. Contract talks progressed. Capacity tightened. Hold all three at once and the only way they fit is redistribution. A tightening market with flat total volume means the queue got longer for some and shorter for others, and the total is exactly what you would see if you were standing far enough back.

Why it happens now, and why now is the awkward part. Annual contracts set a paper number: a commitment, a weekly allocation, a rate per box. That number is negotiated in an office during the first quarter, while the physical flow keeps running at full speed outside the window. So for several weeks the paper is being redrawn underneath cargo that is already moving. Nobody at the counter knows exactly how many slots they control next month, and the default answer when nobody knows is we will see.

A sea box passes four physical gates, and space is only one of them. Booking confirmed. Empty container released at the depot. Truck in the gate before the terminal cutoff with an appointment. Loaded on board. Capacity tightening does not fail all four at once, it fails them in order, upstream first. You get the slot but the depot has no empty. You get the empty but the terminal appointment book is full for the day you need. You gate in on time and still get rolled, because the vessel was sold twice. Each failure looks identical from your desk: a box that is not on the water.

The one that bites in a tight market is not vessel space. It is the empty. Depots run lean, and the same tightening that makes carriers careful about slots makes them careful about repositioning empties into the depots that need them. A depot with no empties on a Monday morning is a two or three day problem, and two or three days is the difference between this vessel and the next one.

Who feels it first. A small shipper with no commitment buys sailing by sailing, and in a tight week is the first to hear the words no equipment. A mid-size shipper has a monthly number but not a weekly one, so the split across the four or five sailings in that month is decided by whoever is holding the forwarder's book, and that is not you. A large shipper has a contractual allocation and still negotiates the weekly distribution, so the pain moves to the terminal appointment and to the depot nearest the factory at month end. Size buys you a slot. It does not buy you a gate appointment at four in the afternoon on the last working day.

Direction changes the shape of the damage. An exporter on a fixed production calendar, contract manufacturing with a promised ship date, cannot advance and cannot easily delay, so a roll becomes a customer conversation. An importer feeding a distribution centre with a fixed inbound window eats the roll as a promo date that slips, which is more expensive than the freight. And the mix matters. In a tightening market with flat total volume, the volume that holds up is usually the committed contract cargo, which means the shipper being quietly trimmed is the one buying on spot. Floors do not get cut. Spot gets cut.

When you feel it. Two to three weeks after the ink, at the first month end. Month end is when everybody's volume lands at once, the appointment book fills, the depot drains, and the trucker who was fine on the twelfth is stretched on the twenty-eighth. The first symptom is never a rate. It is a phone call about equipment, or a gate-in that gets pushed to tomorrow, and by then the vessel has already closed.

Here is the part the release does not say. Visibility tells you where the box is. It does not tell you whether the box will be on the vessel. Those are two different instruments and only one of them points forward. The forward-looking one is an allocation ledger: booked, gated in, loaded, rolled, by week and by vessel string. If your forwarder cannot show you a roll count, the dashboard is showing you the past with a lot of colour.

And the tell during contract season is not volume at all. It is your own roll ratio. A market that is genuinely tight will roll cargo that was booked; a market that only looks tight will roll the cargo that arrived late. Your roll ratio separates those two cases, and it is the only number in this story that is about you rather than about the market.

The second thing nobody puts in the release. Allocation is not a right, it is a habit. Carriers and forwarders protect the accounts that show up every week, gate in early, and never leave a booking hanging. The shipper who books on the Thursday before the cutoff is not being punished for being small. They are being ranked. In a tight quarter the ranking is the whole game, and it is decided by behaviour you can change this week, not by a clause you can negotiate next month.

Put the assumptions where you can see them, because this arithmetic is mine and not the forwarder's. Assume you move 120 FEU a month. Assume a tight week delivers 90 percent of what you booked, so you are 12 FEU short. Assume each short FEU costs 2,700 all in: 1,800 of expedited replacement and 900 of customer penalty or line-down exposure. One bad week is 32,400. Two bad weeks in a quarter is 64,800. Now assume you pre-buy 10 percent headroom, 12 FEU, at a premium of 120 per FEU, which is 1,440 a month and 17,280 a quarter. The insurance costs about a quarter of the failure it prevents. Those are my numbers, invented to show the shape, not taken from any announcement.

What happens if you sign and then wait. The first six weeks of the contract are your weakest six weeks, because your name is not yet on the weekly list and the list is a queue. When capacity tightens further, a queue is not a rate problem, it is a position problem, and you are at the back of it holding a signed document that says you have space.

The traps are boring and expensive. Reading a commitment as a weekly allocation. Assuming the forwarder's allocation is your allocation, when it is their book and your name is one line in it. Forgetting that the empty container is a separate booking from the vessel slot in most markets. And missing that the terminal appointment book belongs to the terminal, so neither your carrier nor your forwarder can magic a slot on the day your truck finally arrives.

↑ Back to the key points

— By Ömer Kaya