Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 8 May 2026, pull the last four weeks of gate-in and gate-out timestamps for your top two import lanes and calculate turns per truck per day; if the number has fallen more than 15 percent against February, treat the lane as congested and move it to pre-pull.
- Before 15 May 2026, secure at least 20 off-dock yard slots within 30 miles of your main gateway, priced per day per container, so a queued box has somewhere to go that is not a chassis.
- Rewrite each drayage tender to name a booked appointment window and a defined wait charge, and cap the wait charge at a fixed number of hours per container so queue cost becomes a known line instead of an open meter.
- Through peak, hold a deliberate 25 percent of monthly import volume on the spot market, so you see the real clearing price weekly instead of discovering it in August.
- Add a detention and per diem line to every customer quote for June and July shipments, sized at three days per container, and reconcile it against actuals on the first Monday of each month.
FreightWaves reports US truckload rates firmed in late April as the import surge strained drayage and domestic linehaul capacity near coastal gateways. Spot dry-van rates rose modestly while dedicated contracts held. Carriers said driver availability, not equipment, is the binding constraint into peak season.
The Analysis
Late April, the import surge came ashore, and the first thing it hit was not a ship. FreightWaves reports that US truckload rates firmed as the surge strained drayage and domestic linehaul around the coastal gateways, with spot dry-van up modestly while dedicated contracts held. Carriers gave the reason without dressing it up: driver availability, not equipment, is the binding constraint going into peak.
Read that sentence twice, because it decides what kind of problem you have. A tractor shortage is a rental problem. A driver shortage is an hours-in-the-day problem, and hours are the one thing nobody can rent at the last minute.
So the question for an importer in May is not whether a truck can be found. It is which of your containers will be sitting on a chassis at seven in the morning waiting for a gate slot, and whose account that wait lands on.
Walk the box and the friction becomes visible. It comes off the vessel and lands in the terminal stack. Then a drayage truck has to do four things in a fixed order: hold a gate appointment, get through the gate, get the right box under the crane, and get out before the container's free time runs. Each of those steps has its own capacity, and they are not equal. The crane can lift more boxes in a shift than the gate can push trucks through, and the gate can push more trucks through than the road and the driver's clock can deliver in the same hour. Volume rises, the queue forms at the narrowest step, and this month it formed at the gate and in the driver's seat.
Take the carriers' line literally. Chassis are around. Tractors are around. What is not around is a driver who can be in two places, and a drayage driver's day is a small, fixed number of turns. A bad day is two. A good day is four or five. Every hour spent queued inside a terminal is an hour subtracted from the next turn, and terminal queues grow with volume rather than shrink. The fleet's effective capacity therefore falls before a single driver has quit or been hired. That is the mechanism behind a firming spot market sitting next to a flat contract book: the carrier serves the committed accounts with the turns it can schedule, and the spot market clears whatever turns are left over. The leftover is you.
This is why the split between contract and spot matters more than the rate itself. If your volume sits inside a dedicated contract, you are on the held side of this market for now. That is not generosity. The rate is held because you handed the carrier something in exchange, usually a volume commitment and a schedule, often a fixed appointment window. A fixed appointment window is a promise about time, and time is precisely what has become scarce. When the surge lands, the carrier protects the contract customer first, and the contract rate stays where it is while the service quietly gives way. You will not find that on the invoice. You will find it in a door appointment that slides from Tuesday to Thursday, and then to the following Monday.
Who hurts first is not a matter of size, it is a matter of who controls the appointment. An importer with its own chassis pool, a contracted drayage fleet and an off-dock yard takes a modest cost bump and barely notices the service. A mid-sized importer without a yard takes it in detention and per diem, because the container's clock starts before the truck does. A small importer buying drayage one box at a time takes it as a lost week: the appointment that never arrives, the per diem that begins on day four, the customer who was promised Friday. Across the same gateway, an exporter on a steady lane is largely untouched. Export drayage is booked around a sailing the shipper controls; import drayage is booked around a vessel arrival and a terminal's queue. Those risks are not symmetrical, which is why a story about import volume turns up on your books as a story about import cost.
The calendar is short. This is a late-April print, and peak volume begins loading in Asia in May and lands in June and July. Drayage congestion leads the retail peak by roughly the length of the ocean leg, so the queues being reported now are the early ones. For an importer on the West Coast or the Gulf, the thing you will actually feel is a two-to-four week decay in appointment reliability starting in the second half of May, followed by a detention bill in June that reads like a rate increase and is not one. Rates move slowly. Accessorials move fast.
Here is the part the rate story cannot carry. Driver availability is a scheduling problem wearing a labor-cost costume. The number that binds is neither drivers nor tractors. It is turns per driver per day at your specific gateway, and that number is set by how long a truck sits inside the terminal. Add trucks and you add nothing. You can, though, take the terminal out of the critical path: pre-pull the container to an off-dock yard before you need it empty, and a gate queue becomes a yard slot plus a rent line. The trade is real and it is calculable, because rent is quoted per day per container and known in advance, while detention starts on a clock nobody answers the phone about.
The second half of this is the part that surprises people. A pre-pull does not only buy time; it returns a chassis and a driver turn to the pool you are competing in. The importer who pre-pulls is quietly thinning the scarcity that is being priced against everyone else. Selfish move, collective side effect, and the first ones to make it in a tight gateway get the most out of it.
Leave it alone and the bill arrives in pieces. The container sits. Per diem accrues from the day after free time. The drayage carrier, who is queuing on your behalf, bills the wait. Your customer, who was given a delivery date, gets a story about the port. The cost of waiting is not the rate; the rate is the smallest number in this story. Pre-pull instead and you pay rent you can forecast, you hand the chassis back, and you take your turn out of a queue you do not control.
Run the arithmetic on my assumptions, not the article's, because the article publishes none of these. Take 40 import containers a month through one coastal gateway, five days of free time, and a queue that adds three days between discharge and pickup. Assume per diem of 150 dollars per container per day after free time, and a wait charge of 65 dollars an hour. Three days of per diem across 40 boxes is 18,000 dollars a month. Four hours of wait per box adds another 10,400. That is 28,400 dollars a month of pure queue, sitting on top of a drayage spend that is itself probably six figures. None of that number is a rate. All of it is calendar.
Move the calendar. The work this week is to get your containers out of the queue before the queue makes the decision for you, and the tools are dull: earlier pulls, honest appointment windows, a yard you can actually use, and a written split between what you commit and what you buy on the spot.
↑ Back to the key points