Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 5 June, get a written surcharge schedule for every air lane, with each line's trigger and expiry date; treat any line without an expiry as open-ended and price it as permanent.
- Move up to 30% of June tonnage to belly, choosing only shipments with more than five days of buffer, and review the split on 1 July against actual on-time performance.
- For any cargo rebuilt from freighter pallets to belly contour, book the rebuild a full day before cutoff and set the handling charge against the rate saving before the shipment is confirmed.
- Reserve freighter block space for the fourth quarter before 31 July, sized to the e-commerce peak, because belly capacity will not be there in August.
Xeneta reports air-freight yields face downward pressure as passenger-belly capacity returns to pre-disruption levels, even as e-commerce demand stays firm. The platform said lane-specific surcharges persist on tight corridors, and advised shippers to blend freighter and belly capacity to manage both cost and reliability.
The Analysis
Xeneta has air-freight yields under pressure as passenger belly capacity comes back toward pre-disruption levels, with e-commerce demand still firm. Lane surcharges hold on the tight corridors, and the advice is to blend freighter and belly lift.
Belly is not capacity you ordered. It is the space left over in somebody else's passenger schedule, sold late, and it returns in the shape the passenger network wants, not the shape your cargo needs.
If you are booking air for anything that has to land in July or August, the cheap window is open now and it shuts when the passenger load factor climbs. That is a fact about the hold, not an opinion about the market.
Look at the hole the cargo goes into. A freighter takes three-metre pallets and heavy density through a main deck door wide enough to drive a loader into. A belly takes loose pieces and contoured containers through a side door, built to the curve of the lower deck, with a height limit that surprises people the first time they meet it. So moving to belly is not a booking change. Pallets come down, cargo gets rebuilt, somebody re-labels it, and that is a day and a handling charge before the first kilo leaves the ground.
The chain in the Xeneta note is straightforward. Passenger flights return, belly space returns, lift supply rises, yields come under pressure. The part that gets lost is geography. Belly comes back to passenger airports on passenger schedules. If your consignee sits near a cargo-only field, the returning lift never touches your lane; it improves the pairing between two passenger hubs instead. That is how an average yield number and your own quote can move in opposite directions in the same month, and both be true.
There is a hierarchy inside that space, and it decides your summer. Belly cargo is residual. When a flight goes out weight-limited, or the passenger load fills, cargo comes off first. Bags go, freight waits for tomorrow. In July and August the holds fill with bags, on routes where families fly and freight also wants to go. The capacity that just came back therefore leaves in the exact weeks e-commerce needs it most. Supply here is seasonal against demand, and because it is a by-product, nobody is managing it on your behalf.
Size and commodity change the exposure. A small shipper buys spot through a forwarder and sees the surcharge rather than the base, which is the worst half of the invoice to be holding. A mid-size shipper can contract blocked space and gets a floor under the peak. E-commerce needs the fourth quarter, which is the worst belly quarter of the year, so its real question is not the rate, it is whether the lift will exist. Perishables and pharma sit on the other side: their recovery option on belly is the next passenger flight, maybe twenty-four hours later, and for them reliability is the whole product.
The piece nobody puts in the press release is the surcharge schedule. Yield pressure is a carrier-side average. On your invoice the base rate can fall while fuel, security and peak lines hold their ground, so the all-in number drops more slowly than the quote did, and on a tight corridor the lane surcharge may not drop at all. Negotiate the list, not the headline: every surcharge line, its trigger, and the date it expires. The second thing is a reliability asymmetry that no rate table shows. A freighter waits for cargo. A belly flight leaves when the passengers board. Blending is therefore a service decision dressed as a cost decision, and the correct split is set by what one day of delay costs that SKU, not by the rate per kilo.
Timing follows the passenger calendar, not yours. Belly is cheap and available in the shoulder weeks, which means now, through June, and again in September. It is scarcest in July and August. So the deferrable tonnage belongs in June, the fourth-quarter e-commerce volume belongs on freighter space booked early, and anything that must move in August needs a freighter option attached before the summer schedule takes hold.
My assumptions, stated, since the article gives no figures. Take twenty tonnes a month on one lane and assume up to thirty percent of it can move without hurting the promise. At a saving of s per kilo, that is six thousand kilos times s each month. Take ten pallets that need rebuilding at h each, and the first month only pays if six thousand times s clears ten times h. That is my assumption, not a number from the article. Then add the delay: one day late on a launch SKU can cost more than a year of s, which is why the split has to be made per SKU and not per lane.
Go belly-only and the hold closes in July. You do not get a cheap shipment; you get a late one, at whatever spot is quoted that morning, plus a rebuild you already paid for. Stay freighter-only and you buy reliability on the slow SKUs that never needed it, which is a leak that never shows up as an incident and therefore never gets fixed.
The call is one this week, and it needs two numbers per lane. Ask for the surcharge schedule in writing with each line's expiry date, and ask for the last date the belly option is protected before the summer load factor takes the hold. Then split your June tonnage with those two answers in hand. Belly is a good deal only while somebody else's passengers are staying home.
↑ Back to the key points