Read this first — the conclusion, and the moves to make:
- This week, pull the last four weeks of gate-appointment records, name the three slots that fill first, and book those slots 48 hours ahead for every peak box.
- Before the first peak sailing, run one live test move through the alternate gate on a non-urgent box, and document the gate time, the chassis source and the actual door-to-door hours.
- Put a named backup haulier with its own drivers under contract for at least 10 percent of weekly volume, with a written four-hour response commitment, and keep it warm with one box a week.
- Write the switch trigger down: two consecutive days with no same-day slots means 20 percent of next week's boxes move to the alternate gate, decided by the transport lead, not by committee.
- Review the empty-leg ratio every Friday and hold extra moves below 1.15 per loaded box for the whole peak.
Logistics platform C.H. Robinson advised shippers to adopt dynamic routing and multimodal flexibility as peak-season capacity tightens across ocean and drayage. The company said real-time visibility and upfront capacity commitments are the main levers to protect service levels and cost this cycle.
The Analysis
C.H. Robinson's peak note this week lands on two legs at once: capacity tightening on the ocean side, and tightening again on drayage. The advice it gives is dynamic routing, multimodal flexibility, real-time visibility, and capacity commitments made early rather than late.
Dynamic routing is a software phrase for a physical act. It means somebody at six in the morning decides that this box leaves through a different gate, on a different chassis, behind a different driver, and still catches the vessel. Cheap to draw on a screen. Expensive to execute on asphalt.
The part worth separating is the sailing from the last forty minutes. The water side of this peak was planned weeks ago and will mostly hold. The drayage side gets decided the same morning it happens, and that is where the queue actually forms.
Read the note as a list of constraints and it says something narrower than it appears. Two legs are named, ocean and drayage, and the levers named are visibility and commitment up front. Both levers are about information arriving earlier. Neither one adds a truck, a chassis, or a gate slot. That distinction matters, because a shipper can buy visibility this afternoon and still have no appointment tomorrow morning.
The chain from a tight ocean market to a blocked gate is short and mostly mechanical. When carriers adjust sailings, boxes stop arriving in a rhythm and start arriving in clumps. A terminal that takes four vessels in three days instead of three in four needs the same number of trucks compressed into a shorter window. Truck capacity is a daily quantity. A driver does a handful of turns in a shift, and you cannot bank a Tuesday turn for Thursday. So bunching at the berth becomes a queue at the gate, and the queue does not add boxes, it adds hours. Hours are what the appointment system hands out.
Here is where I get skeptical of the word dynamic. Move a box from terminal A to terminal B in the same metro and nothing is decoupled. The two gates draw on the same chassis pool and the same driver labour market. You have moved the queue twenty miles and paid a second gate fee for the privilege. Real decoupling looks different: a chassis from another source, a haulier who owns his trucks instead of brokering them, a rail ramp inland, or simply a different day. Route change is the weakest of those and the easiest to sell, because it fits on a slide.
An alternate gate is worth exactly what you have tested. A route you have never run is a rumour with a map attached. The week you need it is the worst week to discover that the backup terminal has the same seven-in-the-morning appointment crunch, the same chassis shortage, and a queue of its own made up of everyone who read the same note.
The cost of optionality does not land evenly. A large importer with a dedicated haulier and its own chassis already owns the option, and using it costs a phone call. A mid-size importer buying drayage box by box on the spot market pays for the option whether or not it is used, because a haulier who promises to switch has to keep slack drivers on the payroll, and slack is never free. A small importer has no option at all and takes whatever slot is left at ten in the morning, which in a tight week is the slot nobody wanted. Direction matters too. Importers feel this at pickup, at the gate, with a box sitting on a chassis that is billing. Exporters feel the same squeeze at the other end: empty return, gate-in cut-off, and a vessel that will not wait.
The calendar tells you before any rate does. The first signal is the appointment screen, with the seven o'clock slots gone by nine the previous morning. The second is the chassis count in the yard, the number a dispatcher reads out loud on the phone. The third is your haulier asking for two days of notice instead of same-day. Price is the fourth thing to move, not the first. In a market that tightens week by week rather than overnight, the sequence runs appointments, chassis, drivers, money. Watch the rate to decide when to act and you are three steps behind the constraint.
What the note cannot say, because it is selling the flexibility, is that dynamic routing is not a capacity strategy. It is a queue-joining strategy with a carrying cost that arrives before the first switch. Two mechanics are worth naming. Optionality gets priced on a hundred percent of your volume and consumed at whatever your real switch rate turns out to be, so a shipper who never moves a single box still pays for the right to. And every route change adds an empty leg, a chassis or a box repositioning to wherever it is now needed, and that leg consumes exactly the two things that were scarce to begin with: a driver-hour and a gate slot. A market where everyone routes dynamically is a market where the average box makes more moves to carry the same cargo. Individually rational, collectively expensive. That is the sentence a platform cannot put in its own note.
Numbers in this paragraph are my assumptions, not figures from the article. Take an importer moving 40 FEU a month, which is 10 a week, across a ten-week peak. Assume a quarter of the boxes need a route change somewhere in that window. That is 2.5 boxes a week, each costing one extra gate move and about a day and a half of extra dwell. The bill comes to roughly 3.75 container-days and 2.5 extra gate moves a week, which over ten weeks is around 37 container-days and 25 extra moves, for the same cargo on the same vessels. Then add the retainer for the standby haulier who makes those moves possible. That retainer is charged on all 40 boxes, not on the ten that actually move. You are insuring the whole book to cover a quarter of it, and the empty legs are being paid for out of a pool everybody shares.
Strip the option away and see what is left. Without an alternate, a box that misses its appointment waits for the next free slot and then risks rolling to the following vessel. The cost is dwell plus the roll, and the roll is the part that hurts, because it resets the whole downstream plan. But the honest counterfactual to dynamic routing everywhere is not static routing everywhere. It is one pre-built alternate that has actually been run once, in a quiet week, with a named driver and a known gate. That costs one test move. Skipping the test costs you the discovery, at the worst possible moment, that the backup was theoretical.
The trap I see most often is treating visibility as the deliverable. A dashboard that tells you the box is stuck is a receipt, not a lever. It documents the wait and does nothing to shorten it. The lever is the appointment you already hold, the chassis you already reserved, and the driver who already knows which gate takes the booking sheet. Today's job is small and unglamorous: pull last week's appointment log, find the three slots that fill first, and treat those three as the constraint. Not the rate. The three slots.