Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By the end of January, measure ninety days of dock dwell at your two slowest doors and put the median on one page; anything over ninety minutes goes into the bid package as a fix you are funding this quarter, not a promise for next year.
- Before signing a dedicated block, set the weekly minimum at 85 percent of your trailing thirteen-week average instead of your peak week, and cap shortfall exposure at four weeks of billing.
- Require every intermodal bid to state the ramp cut-off, the drayage transit time and the chassis source in writing, and reject any schedule that plans pickup within sixty minutes of the cut-off.
- Ring-fence the transition week by keeping the outgoing carrier's tractors available for five working days past the award date, and budget one week of overlap cost into the award.
- Track missed cut-offs weekly as a percentage of boxes moved, and treat anything above 3 percent as a drayage scheduling defect to be closed within fourteen days.
Coyote reported early-year freight bid activity as shippers lock capacity amid rate stabilisation. The broker said dedicated and intermodal conversions are gaining share as planners diversify networks.
The Analysis
Coyote's early-year note is three clauses long and carries no numbers: bid activity picked up as shippers moved to lock capacity while rates steadied, and dedicated plus intermodal conversions took a larger share as planners spread their networks. That is a thin release. It is also the only kind of release that tells you what the next quarter will feel like on the ground, because it is describing a change in who owns the trucks, not a change in what they cost.
I read bid season with a stopwatch, not a rate sheet. A tender is a piece of paper until somebody puts a tractor at your gate at six in the morning, and the thing that decides whether that happens in April is how your dock behaved last November.
The conversion sentence is the one worth arguing about. A conversion is not a price event. It takes capacity out of the pool that spot buyers were quietly relying on, and it changes the shape of your risk from soft to hard.
Start with what a bid actually is. When bid activity picks up in January, the freight itself has not changed; what changed is that shippers stopped waiting for the rate to fall further and started queuing for trucks that do not exist yet. A tender is a reservation against future capacity, placed months before that capacity is confirmed. Everyone who bids inside the same four weeks is bidding for the same tractors, the same drivers, the same ramp slots. The queue is invisible, which is exactly why people are surprised in April.
Dedicated conversion and intermodal conversion are the same move in different clothes. Dedicated means a block of tractors is committed to your lanes on a weekly basis, so the carrier stops shopping your freight against someone else's. Intermodal means the long leg goes on a train and your exposure moves to the ramp: the drayage in, the lift, the cut-off, the chassis. Either way you are trading flexibility for a claim on a fixed physical asset, and the asset has a hard limit that does not negotiate.
Where it jams is the dock, and this is the part the release has no field for. The constraint order at any shipper runs doors, then yard, then driver hours, then tractors. If you have six doors and one eight-hour shift, your ceiling is arithmetic and no tender changes it. A truck that sits three hours at your door is not a line on your invoice. It is a data point in the carrier's scorecard, and it comes back eleven months later either as a padded rate for your lane or as a polite decline to bid at all.
Size decides which of these bites you first. At forty or more loads a week with a flat profile, dedicated conversion is a genuine win: named drivers, the same tractor at the same door, and your dwell stops mattering because the carrier has priced it in and staffed around it. Between eight and twenty loads a week, intermodal is the obvious conversion and it hands you a new failure mode in exchange: a hard cut-off. Below five loads a week you cannot earn dedicated capacity at all, so you buy whatever is left of the spot market after everyone else has converted, which is the late windows and the older equipment. Direction matters as much as size. On the export side the pinch is the pickup window and the port cut-off. On the import side it is the receiving appointment and whether your dock can actually take the box inside the hour it was promised. Same truck, opposite ends of the run, and the import side usually owns the delay.
The calendar is dull and unforgiving. Bids go out in the first weeks of January, awards land in February and March, and the trucks start showing up in April. Two dates inside that window will cost you more than the rate: the transition week, when the outgoing carrier is winding down and the incoming one has not staffed your lane yet, and the first Monday of a dedicated contract, when the weekly minimum starts billing whether your orders arrived or not. Nobody schedules a meeting for either.
Here is what the release does not say, and it is the piece I would put in front of a CFO. Carriers score shippers. Dwell at the dock, appointment adherence, load and unload time, how often you turn a driver away at the gate, all of it goes into a file nobody shows you. In a market where capacity is being converted out of the spot pool, that file decides whether you get called first or last when a lane tightens. Your dock is a capacity asset, and it depreciates every time a driver waits.
There is a second thing, and it is the one that catches people who convert carefully. Intermodal conversion swaps a soft constraint for a hard one. A truck can wait two hours. A train cannot wait two minutes. Once you are on the ramp, the miss almost never happens on the five hundred miles of rail; it happens in the last three miles of drayage, in the queue at the gate, because somebody scheduled the pickup against the cut-off instead of against the traffic on the way there.
Run the arithmetic with my own numbers, since the release gives none. Assume one lane at forty loads a week and a dedicated block with a forty-load weekly minimum. Assume eight weeks of the year come in twenty percent light, which is ordinary seasonality rather than a failure. That is eight loads a week for eight weeks, sixty-four loads you pay for and never use, and at an assumed sixteen hundred dollars a load that is roughly a hundred and two thousand dollars of air. On the intermodal side, same forty boxes a week, assume one in twenty misses the ramp cut-off: two a week, about a hundred and four a year.
Recovering each one by truck at an assumed six hundred dollars against a hundred and eighty for the normal drayage is four hundred and twenty dollars, so about forty-three thousand seven hundred a year, and that is before late-delivery penalties and the phone calls. These are my assumptions, not numbers from the release. The comparison is the argument: the cut-off discipline you can fix this month is worth more than the rate spread you will spend six weeks negotiating.
If you do not convert, you keep your flexibility and you keep the spot market's worst weeks along with it. In a soft year that is cheap and you will feel clever. In the six or eight weeks that genuinely tighten, you will be the shipper taking a truck at nine at night and eating the missed appointment. If you convert and leave the dock alone, you have bought tractors you cannot load, and you will pay minimums on air while trailers stack in the yard. The failure is rarely picking the wrong side of the conversion. It is converting the contract without converting the dock.
The trap I see most often is a dedicated minimum built on last year's peak week, signed in February, sitting on top of a ramp cut-off that nobody on the logistics team has ever measured with a stopwatch. Both start as paperwork problems and turn into physical ones in April. The action that costs nothing today is to pull ninety days of gate-in and gate-out times for your two slowest doors, put the median dwell on a single page, and get the real ramp cut-off in writing with the drayage transit time attached before you sign anything. If that median is over ninety minutes, fix it first. Trucks you cannot load are the most expensive trucks you will ever buy.