Transpacific Peak Refuses to Break: Ocean Alliance Loops Clear $10,000 a Box
2026-10-26 · Ocean Freight
China–India container spot rates more than double since July as vessel space tightens
2026-10-03 · Ocean Freight
Suez reopening softens the Red Sea cost floor; SCFI Europe at $2,643/TEU, nine weeks of falls
2026-09-30 · Ocean Freight
Transpacific rates surge up to 7% as Asia-Europe slides 9% in seventh week of split
2026-09-27 · Ocean Freight
SCFI jumps 2.9% to 3,509.54, 25-month high as US East Coast spot breached $10,000/FEU
2026-08-30 · Ocean Freight
SCFI holds above 3,300 as US lanes firm and Europe slips: USEC at $9,568/FEU
2026-08-19 · Freight & Logistics
Intra-Asia container rates hit six-week high at $1,028, SCFI extends run
2026-08-13 · Freight & Logistics
Transpacific GRIs take hold as Asia gateway congestion lifts US rates
2026-08-12 · Freight & Logistics
Peak-season rates stay elevated as SCFI extends six-week winning run
2026-08-10 · Freight & Logistics
Asia-Europe spot rates slide to $4,300-$4,900/FEU despite Red Sea risks
2026-08-09 · Freight & Logistics
CMA CGM hikes FAK rates and adds $1,500 PSS on Med-Middle East trades
2026-08-08 · Freight & Logistics
Asian port jams push transpacific spot rates above $6,200/FEU to US West Coast
2026-08-08 · Freight & Logistics
Red Sea disruption deepens as Houthi threats cut Bab el-Mandeb traffic to 11 ships
2026-08-08 · Ocean Freight
Drewry WCI Rises 1% to $4,297/FEU as Transpacific GRIs Lift Shanghai-New York 4%
2026-08-07 · Ocean Freight
Drewry WCI Snaps Three-Week Slide, Rising 1% to $4,297 on Transpacific Strength
2026-08-06 · Ocean Freight
Panama Canal Cuts Max Draft to 14.78m From Aug 15, Lifting Asia-US East Coast Rates
2026-08-05 · Ocean Freight
Panama Canal Cuts Maximum Draft to 14.78m From Aug 15 as El Nino Squeezes Transits
2026-08-04 · Ocean Freight
Container rates ease from peak: SCFI -3.28% to 3,080, Drewry WCI slips to $4,000
2026-07-24 · Ocean Freight
IATA Cuts 2026 Air Cargo Growth Forecast to 0.2% Amid Middle East Disruptions
2026-06-28 · Freight & Logistics
DHL: Asia Pacific Demand and Tightening Capacity Drive Freight Rates Higher Across Air and Ocean
2026-06-16 · Ocean Freight
Drewry WCI Climbs to $3,549/FEU as Transpacific and Asia-Europe Rates Accelerate into Peak Season
2026-06-13 · Ocean Freight
Container Peak Season Arrives Early as Freight Rates Skyrocket Across Major Trade Lanes
2026-06-12 · Ocean Freight