As of 2026-10-15, the express fuel surcharge is DHL 45%, FedEx 43.25% and UPS 46.25% of the freight charge — so on a USD 20,000 shipment the fuel line runs from about USD 8,650 to USD 9,000 depending on carrier. Rates are revised weekly and on different schedules, which is why FedEx is currently the cheapest on fuel alone. 2026 has been an expensive year on this index: at 48.29%, DHL is running 20.73 points above its own 20-year average of 27.56% and only 2.02 points below its 2022 record. Everything below is drawn from 20 years of reconstructed weekly history, anchored to the published rate of each carrier.
How is a fuel surcharge calculated? It is not a fixed fuel price. Carriers take a base index — for DHL, FedEx and UPS the reference is the weekly US Gulf Coast kerosene-type jet-fuel index (FRED series MJFUELUSGULF) — convert it into their own billing currency, apply a carrier-specific coefficient and a floor/ceiling, then publish the result as a percentage of the freight charge.
Three consequences matter when you quote:
| Carrier | Current rate | Effective week | Source |
|---|---|---|---|
| DHL Express | 45% | 2026-09-21 | Verified published rate |
| FedEx | 43.25% | 2026-09-21 | Verified published rate |
| UPS | 46.25% | 2026-09-21 | Verified published rate |
Current express fuel surcharge rates (percentage of freight).
| Week starting | DHL Express | FedEx | UPS |
|---|---|---|---|
| 2026-09-21 | 45% | 43.25% | 46.25% |
| 2026-09-14 | 44.75% | 43% | 46% |
| 2026-09-07 | 43.5% | 43.25% | 47.85% |
| 2026-08-31 | 43.25% | 43.25% | 47.85% |
| 2026-08-24 | 42.5% | 43.25% | 47.85% |
| 2026-08-17 | 42% | 43.25% | 47.85% |
| 2026-08-10 | 40.25% | 42.65% | 47.18% |
| 2026-08-03 | 38.25% | 40.25% | 46.25% |
| 2026-07-27 | 37.28% | 40.97% | 44.75% |
| 2026-07-20 | 39.77% | 40.12% | 40.5% |
| 2026-07-13 | 42.26% | 39.24% | 39.25% |
| 2026-07-06 | 44.76% | 47.75% | 39% |
| 2026-06-29 | 47.25% | 37.29% | 39.25% |
| 2026-06-22 | 48.29% | 36.31% | 42.25% |
Weekly surcharge rates over the last 13 weeks. DHL, FedEx and UPS do not always move in the same week — the gap between them is what decides which carrier is cheaper on a given shipment.
| Freight charge | At DHL 45% | Fuel surcharge |
|---|---|---|
| Freight USD 5,000 | 45% | USD 2,250 |
| Freight USD 20,000 | 45% | USD 9,000 |
| Freight USD 100,000 | 45% | USD 45,000 |
Worked examples at the current DHL rate of 45%. The formula is simple: fuel surcharge = freight charge × rate%. On a USD 100,000 shipment the surcharge alone is about USD 45,000 — which is why the rate should be quoted explicitly rather than buried in a freight number.
| Carrier | 20-year high | 20-year low | Average | Volatility (SD) |
|---|---|---|---|---|
| DHL Express | 50.31% (2022-07-25) | 7.59% (2020-06-01) | 27.56% | 8.84% |
| FedEx | 47.75% (2026-06-01) | 7.19% (2020-04-20) | 26.26% | 8.49% |
| UPS | 52.75% (2022-06-13) | 7.96% (2020-04-20) | 29.03% | 9.36% |
All-time extremes reconstructed from the public USGC kerosene-type jet-fuel index (FRED MJFUELUSGULF), anchored to the published rate of each carrier. Shape is reliable; absolute historical levels are estimates.
| Month | DHL | FedEx | UPS |
|---|---|---|---|
| January | 25.34% | 23.83% | 26.37% |
| February | 24.54% | 27.2% | 30.09% |
| March | 26.64% | 41.09% | 45.46% |
| April | 39.2% | 45.41% | 50.23% |
| May | 46.99% | 44.36% | 49.9% |
| June | 48.03% | 38.87% | 43.75% |
| July | 41.02% | 42.02% | 40.88% |
| August | 41.25% | 42.53% | 47.4% |
| September | 44.42% | 43.17% | 46.7% |
Month-by-month average surcharge in 2026. Fuel surcharges typically peak in the winter half (October–February) and soften in spring.
| Month | Avg surcharge (all carriers, 20Y) |
|---|---|
| January | 26.05% |
| February | 26.02% |
| March | 26.52% |
| April | 27.69% |
| May | 28.31% |
| June | 28.49% |
| July | 28.26% |
| August | 28.46% |
| September | 28.64% |
| October | 27.92% |
| November | 27.21% |
| December | 27.11% |
Across 20 years of history, September averages 28.64% and February 26.02%. If you can shift a shipment by a few weeks, that gap is worth real money.
DHL Express fuel surcharge is currently 45% of the freight charge, effective from the week of 2026-09-21. It is revised weekly.
DHL derives the surcharge from the weekly US Gulf Coast kerosene-type jet-fuel index, applies its own coefficient and floor/ceiling, and publishes the result as a percentage of freight. It is charged on the freight charge, not on the declared value of the goods.
On the freight charge. A 30% surcharge on USD 10,000 of freight costs USD 3,000 regardless of what is inside the boxes.
Three reasons: the rate moved between booking and invoicing, the carrier revised the weekly figure after your shipment was tendered, or the freight base on the invoice includes accessorials that the surcharge is applied to. Ask for the rate and effective week in writing.
Weekly, on different schedules. As of 2026-09-21 the rates are DHL 45%, FedEx 43.25% and UPS 46.25%. FedEx is currently the cheapest on surcharge.
On DHL Express the reconstructed 20-year peak is 50.31% and the trough is 7.59%, against a 20-year average of 27.56%. Peak years cluster around 2008 and 2022.
As of the week of 2026-09-21 the three express carriers sit DHL 45.00%, FedEx 43.25% and UPS 46.25%. On fuel alone, FedEx is the cheapest of the three by 1.75 points over DHL and 3.00 points under UPS. That spread looks small, but it is persistent: across the last 13 weeks DHL and UPS have traded the top spot several times while FedEx held the middle. The trap is to chase the headline number. Fuel is only one of three charges on an express invoice — the freight base, the zone/destination rate and the surcharge together decide the bill. A shipment where UPS has the lowest base rate can still cost less overall even when its fuel line is higher. Read the total, not the percentage.
The gap also moves at different speeds. DHL revises on a Monday cadence, FedEx and UPS on their own weekly schedules, so for a few days each cycle one carrier is measurably cheaper before the others catch up. If you tender volume on a fixed day, check the three rates that morning rather than quoting from last week's screen.
The number on the carrier's fuel-surcharge page is a percentage of freight, not a fixed fee — yet the invoice line rarely equals freight × published%. There are three reasons, and only one of them is a mistake:
The fix is contractual, not forensic: ask the carrier or your forwarder for the rate and effective week in writing at tender, and reconcile the invoice against that, not against the public page. Example — a USD 20,000 shipment quoted at DHL 43% should show roughly USD 8,600 of fuel. If the invoice shows USD 9,000, the rate moved to 45%, not an error.
To make the percentage concrete, take a 100 kg document-and-sample express shipment from Shenzhen to Los Angeles. A realistic freight charge for this lane and weight, before any discount, lands in the low-to-mid hundreds of USD. At the current DHL 45% the fuel line is roughly 45% of that base:
| Assumed freight (USD) | DHL 45% | FedEx 43.25% | UPS 46.25% |
|---|---|---|---|
| USD 400 | USD 180 | USD 173 | USD 185 |
| USD 600 | USD 270 | USD 260 | USD 278 |
| USD 900 | USD 405 | USD 389 | USD 416 |
Illustrative only: actual freight depends on zone, dimensional weight and negotiated rate. The point is that fuel is a quarter-to-half as large as the freight itself, so it should be quoted as its own line, not buried in a single number.
Carriers publish the surcharge; they do not usually negotiate it with shippers directly. The lever sits with your forwarder, who buys capacity in volume. Three clauses are worth putting on paper:
A forwarder that resists itemising the surcharge is, in practice, marking it up. The 20-year history on this page is your reference: at a 20-year average of 27.56% (DHL), any sustained quote far above that, or any refusal to show the line, is a flag.
The 13-week linear forecast on this page points to a continued high plateau rather than a sharp drop. The reason is the underlying index: 2026 has been an expensive year, with DHL running at 48.29% in late June — 20.73 points above its own 20-year average and only 2.02 points below the 2022 record. Jet-fuel prices have been sticky because of refinery margins and seasonal demand, and the carriers' coefficients amplify index moves. The prudent planning assumption for 2027 budgeting is DHL in the low-to-mid 40s, FedEx high-30s to low-40s, UPS mid-40s, with the historical 27.56% average treated as a floor that is unlikely to return before a real demand recession. Build quotes on the current rate, not the average.
For shipments leaving Shenzhen, Guangzhou or the Pearl River Delta, two local factors matter. First, most China-origin express volume is billed from the Hong Kong or mainland gateway the forwarder uses; the surcharge is identical, but the transit and the base rate differ, so compare the total landed cost, not the percentage. Second, the peak season (typically Q4 for US-bound e-commerce and the pre-Lunar-New-Year rush) pushes both the base rate and the surcharge up at the same time, so the fuel line compounds the peak-season surcharge rather than adding to a flat base. If you can shift a shipment by a few weeks outside those windows, the seasonality table above shows September averages 28.64% across 20 years versus February at 26.02% — a gap worth real money at volume.
The weekly rate series behind this page (DHL, FedEx and UPS, 2006–2026, reconstructed from the public US Gulf Coast kerosene-type jet-fuel index, FRED series MJFUELUSGULF, and anchored to each carrier's published rate) is offered for reference and attribution. A permanent, citable version is deposited at Zenodo (DOI pending); until then cite the page directly:
The express bill carries at least two separate surcharges that shippers routinely merge in their heads. The fuel surcharge tracks the jet-fuel index and moves weekly, as this page tracks. The peak-season surcharge is a fixed add-on the carriers switch on for a few months a year (Q4 for US-bound e-commerce, the pre-Lunar-New-Year window for Asia outbound) and is unrelated to fuel. In a heavy peak month you are paying both at once, which is why a September or December invoice looks nothing like a February one. When a carrier announces a "peak-season surcharge for 2026", it is a different line from the 45% fuel figure, and it stacks on top. Budget the two separately: fuel as a percentage you can monitor weekly here, peak as a fixed per-kg or percentage add-on you know in advance from the carrier's annual calendar.
The weekly rates on this page are not a hand-typed table. Each carrier publishes its current surcharge; we anchor those verified points to the public US Gulf Coast kerosene-type jet-fuel index (FRED series MJFUELUSGULF), which the carriers themselves reference, then reconstruct the historical curve between published snapshots using each carrier's own coefficient and floor/ceiling. The shape of the 20-year history is reliable because it follows the index; the absolute pre-2006 and between-snapshot levels are estimates and are labelled as such. Where a carrier's own published rate exists for a week, that published number wins over the reconstruction. The practical upshot: use the historical highs, lows and averages for budgeting and negotiation context, but always quote the verified current rate from the cards at the top of this page for an actual shipment.