Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 12 February, get the increase in writing with three items: the amount, whether it applies to the all-in or to the base-only component, and whether fuel-linked surcharges sit inside that base. A date without those three is not a quote.
- Compute both percentages and put them on one line: the increase divided by your actual all-in per FEU, and the increase divided by the base component. If the two differ by more than two points, you are negotiating on the wrong denominator.
- Decide the pull-forward by 20 February, using one test: only advance a booking when the added storage cost per day times the days advanced is smaller than the increase per FEU.
- Protect February volume with equipment, not holds: container release plus cut-off confirmed in writing for every booking you intend to keep, target 100 percent confirmed by 25 February.
- At renewal, anchor the rate to the pre-March level with a written formula, and cap index-linked pass-through at one reset per quarter so a single announcement cannot reprice you twice.
CMA CGM pre-announced a general rate increase effective March 1, signalling carriers would restore rates once the post-holiday build begins. The group advised shippers to lock pre-CNY space to avoid the rise.
The Analysis
A date, a mechanism, and a recommendation. CMA CGM pre-announced a general rate increase effective March 1, and advised shippers to lock space before the holiday to get ahead of it. As releases go that is thin: no amount in what we have, no base, no scope. Which makes the most informative number in it the lead time, not the increase.
Announced on the fifth of February for the first of March, that is a window of a little over three weeks. A window is a mechanism. It is not a courtesy and it is not a forecast. It is a period during which a particular behaviour is worth more to the line than the rate itself.
A GRI is not a price level. It is a step applied to a base, and three things decide whether it lands on your invoice: the amount, the base it applies to, and the cargo it covers. The amount is the loud one and the least useful, because the same dollar step is a rounding error on one trade and a real cost on another. The base decides your percentage. Ocean freight is quoted all-in far more often than it is quoted as a naked base rate, and a per-FEU increase applied to the base-only component is a bigger percentage of that component than of the all-in you actually pay. Two shippers on the same hull can report two different effective increases from the same GRI and both be right. That is not a scandal. It is a definition.
Ask which base, in writing. If the increase is stated per FEU, the base is the container and the percentage depends on the freight level underneath it, which is why a fixed dollar step is regressive: it hurts the cheap lane and the small box more. If it is stated as a percentage, the base is the freight, and the next question is whether surcharges sit inside or outside it. Fuel-linked surcharges move on their own schedule. A GRI calculated on a base that excludes them will not move when fuel does, and the two adjustments can land in the same month pulling in opposite directions. The invoice shows the sum of both. Neither announcement does.
The thing a pre-announcement does that a filing does not: it moves booking dates. Three weeks of notice turns a price decision into a scheduling decision for every shipper who can pull cargo forward, and enough shippers pulling forward makes February look full. A full February is the evidence a carrier needs in March to hold the number. So the increase does not have to be collected on most of the cargo in order to work. It has to move the booking curve, and the booking curve is what it actually moves. Read the release as a demand instrument and the date stops looking like a courtesy.
Read the recommendation as data too. A carrier that tells shippers to lock space before the holiday is telling you where the binding constraint is: pre-holiday space, not the March rate. If space were loose, the advice would be to wait. Advice is asymmetric evidence and it is more reliable than the announcement, because saying it costs the line something.
Three weeks of runway is also unusual, and runway is a tool you reach for when the book in front of you is light. That does not make March 1 soft. It makes the window before it negotiable, for cargo that commits volume and can prove it. A published increase with three weeks of notice and no published amount is a starting position, and starting positions are answered before they take effect, not after.
Who pays, and how much. Fixed contract through the second quarter: the GRI reaches you at renewal, and the only thing that matters is whether the renewal anchors on the pre- or post-March level. Spot with monthly volume: you are the intended reader, and your rational move is to advance February bookings, which costs you a February rate you did not plan and warehouse space you may not have. Small importers with lumpy volume get it twice: they pull forward what fits and pay the step on the rest. Shippers holding annual space with a formula contract sit outside the entire event, which is also why they will be the last to know what the market did.
The date is March 1. The invoice effect is not. Rate attaches to the booking, not to the water: cargo booked before the first at the old rate sails at the old rate even if it sails in March. That single sentence is the whole value of the window, and it is also the trap, because a hold is not a booking. A hold without a container release and a cut-off is a favour, and favours do not survive a full hull. Confirm both, in writing, per booking. The cost then shows up in March invoicing and in April inventory if you carry stock.
Take the other branch. Had the line filed on the twenty-fifth of February for the first of March, shippers would have had days, the increase would have landed on nearly all March cargo, and February would have stayed empty. The pre-announcement exists to avoid exactly that. Which tells you the objective is not the increase but the February book. If February fills and the increase is quietly absorbed at the margin, the line has still won, and the next filing will have the same shape.
Work a unit cost and flag every assumption. A 40-foot box carrying 100,000 dollars of goods, freight at 3 percent of cargo value, so 3,000 dollars all-in, both figures mine and neither from the release. Every 1 percent of freight is 30 dollars on that box. Every 1 percent of cargo value is 1,000 dollars. A 5 percent increase on the freight line is 150 dollars, which is 0.15 percent of the goods inside. A 5 percent move in the goods is 5,000 dollars, which is 33 times larger. The rate argument is being conducted over a number that is 3 percent of the exposure, and the 3 percent is the reason the argument is loud: it is the only number either side can quote with a date attached. On a 10,000-dollar box with the same freight, the same 150 dollars is 1.5 percent of value, ten times the burden, and nobody at the table will mention it.
The mistake is answering a date with a rate. A GRI is a claim about the future book, and the answer to a claim is a booking, not a counter-offer. The second mistake is measuring the increase against the base instead of the all-in: on a base-only comparison the percentage looks larger, the negotiator anchors on the wrong denominator, and the concession that follows is given away in the wrong place. My lock point is not a price, because the release gives me none to lock; it is the cut-off date. Two weeks before the first of March, whatever February volume I intend to protect has a container release and a cut-off in writing, or it was never protected. A pre-announced increase is the rare case where the line hands you the deadline. Missing it is a choice.
↑ Back to the key points