Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- For transpacific or Asia-Med cargo that can ship in April, book before 1 May: the GRI is a dated price step, and the pre-effective window is the cheapest booking period the filing creates.
- Re-baseline Q2 budgets at the GRI-inclusive levels, $1,600 per 40ft US West Coast, $1,900 US East Coast, $1,300 Asia-Med, with a variance line for the share the market actually sustains; on a 60 FEU a month program the full pass-through is about $96,000 a month.
- Put the US East Coast versus West Coast comparison on paper: the carrier's own filing puts $300 per 40ft between the coasts, which is the surcharge-level input to the all-water versus intermodal rail decision.
- Set the validation checkpoint at 15 May: if transpacific spot has not held the GRI-inclusive tariff by then, open renegotiation while the market is soft rather than waiting for the next filing.
- Watch competing filings through April: a GRI holds when the capacity leadership moves together, and a lone filing erodes fastest, so check the other major lines before conceding the increase in contract talks.
CMA CGM published general rate increases (GRI) effective May 1: $800/20ft and $1,600/40ft to the US West Coast, and $950/20ft and $1,900/40ft to the US East Coast. On Asia-Mediterranean, the GRI was $650/20ft and $1,300/40ft.
The Analysis
CMA CGM has filed May general rate increases: $800 per 20ft and $1,600 per 40ft to the US West Coast, $950 and $1,900 to the US East Coast, and $650 and $1,300 on Asia-Mediterranean, all effective 1 May. The per-40ft numbers are the ones to hold: $1,600 west, $1,900 east, $1,300 to the Med.
A GRI is an announcement, not a price. Whether it sticks is decided in the four to six weeks after the effective date, and the lane-by-lane spread in this filing, $300 between the US coasts and $600 between the East Coast and the Med, is the carrier drawing a map of where it expects the least resistance.
Take the structure first. The 40ft is exactly twice the 20ft on every lane, so the filing prices the slot and nothing else, with no high-cube premium and no volume break. Effective 1 May, the tariff shows the new level from that date, and the market then decides whether to live there. That is the whole mechanism, and it is worth being precise about, because the phrase rate increase makes it sound like something that happens to you. It is something the carrier declares and the market then ratifies or ignores.
The gap between the announced and the sustained level is where the money actually moves. If spot holds at or above the GRI-inclusive tariff, the increase is real and your next contract round prices off it. If spot erodes, the tariff becomes decoration and the shippers who conceded it in April negotiations have donated the difference. Carriers file GRIs knowing most of them partially fail; the ones that succeed are the ones backed by capacity discipline in the weeks that follow. So the filing date starts a clock, and the test window is roughly four to six weeks, through mid-May.
The spread inside the filing is the interesting part. The US East Coast carries $1,900 per 40ft against $1,600 on the West Coast, a $300 premium on the longer, canal-dependent leg, and the same logic applies everywhere else: when capacity tightens, the longest loop reprices first because it burns the most ship-days per box. The Med at $1,300 is the cheapest of the three, and that is the tell: Asia-Med is where surplus capacity from other trades gets redeployed, so it is structurally the softest lane in the set. Read as a map of carrier pricing power, the filing says USEC first, USWC second, Med last. If you ship USEC-bound cargo, note that the carrier's own numbers put $300 per 40ft between your two routing options, which is the surcharge-level input to the all-water versus intermodal rail comparison.
Now the mechanism nobody puts in the announcement. A GRI with a future effective date is a demand-creation device. Shippers who were going to move the cargo anyway pull bookings into late April to beat 1 May; the pull-forward fills the ships the increase was meant to firm, and the increase then validates itself. The filing date is chosen to create exactly that window. The shipper's read is inverted: the two or three weeks before a GRI effective date are usually the cheapest booking window of the quarter, because everyone rushes, and then the window shuts. If your cargo can tolerate an April sailing, book it before the date. A dated price step is a tradable thing.
Who pays depends on how you buy. Large BCOs negotiate GRIs out of annual contracts and never see them. Mid-size shippers on indexed or FAK-plus structures inherit the tariff reference and watch it arrive as a billing adjustment. Small shippers with no leverage pay the announced level plus whatever the spot does on top of it. Asia-Med shippers get the mildest version of all three, the lowest filed increase on the structurally softest lane, which is small consolation and still consolation.
Timing, precisely. Cargo booked in April for May loading faces the increase at the load date; cargo that ships in April does not. The validation checkpoint is mid-May: if transpacific spot has not held at or above the GRI-inclusive tariff by then, the market has voted and the increase is withdrawn in practice, which is your cue to reopen the conversation while the carrier is weak rather than to wait politely for the next filing. Q2 bookings made before mid-May are priced in a market whose direction is still unknown; bookings after mid-May are priced in a market whose direction is known. That asymmetry is the whole timing argument.
The counterfactual: if April demand is strong, driven by pre-summer restocking and front-loaded peak, the window fills and the GRI sticks through May and probably into the summer filings. If April is soft, the pull-forward empties May and the increase erodes by late May. The condition that flips it is April booking volume, which the carrier sees before you do, and that is exactly why the filing exists. One more flip: GRIs hold when the capacity leadership moves together. A lone filing that competitors do not follow erodes fastest, so check the other major lines' May announcements before conceding anything in contract talks.
Size it on your own program. On 60 FEU a month transpacific, the full pass-through of the US West Coast GRI is $1,600 per 40ft, which is $96,000 a month. If the market sustains only half the increase, the real cost is $48,000 a month, and the difference between those two numbers is the entire content of the mid-May checkpoint. On the same 60 FEU, the $300 spread between the US coasts is $18,000 a month, which is the size of the prize in a routing decision most shippers make on habit.
↑ Back to the key points