Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 15 May, get the governing date in writing from every forwarder on the lane, whether booking, B/L or on-board, and list the containers that can load before 1 June.
- Run the coast test lane by lane before 20 May: keep the East Coast routing only where the West Coast inland leg costs more than 300 per FEU above the all-water option.
- Split the 1 June book by value density. Above roughly 50,000 per FEU, accept the increase. Below 20,000, treat it as a margin event and escalate to the commercial owner.
- Cap the pre-ship at volume you can load to 85% utilisation or better. Below that, freight per cubic metre rises faster than 1,800 a box saves.
- Diarise 1 July to measure how much of the increase actually collected, and reopen the uncollected balance in the same call with the carrier.
CMA CGM published general rate increases (GRI) effective June 1 on several Asia outbound lanes. The carrier filed $900/20ft and $1,800/40ft to the US West Coast, and $1,050/20ft and $2,100/40ft to the US East Coast. On Asia-Mediterranean, CMA CGM set a GRI of $700/20ft and $1,400/40ft. The carrier said the moves reflect sustained ramp-up in peak-season cargo and network cost inflation.
The Analysis
Nine hundred on a 20ft and 1,800 on a 40ft. East Coast, 1,050 and 2,100. Mediterranean, 700 and 1,400. Three lanes, six numbers, and the 40ft is exactly double the 20ft every time. That ratio is the most informative thing in the release and the one line nobody quotes.
A general rate increase is a filed number, not a collected one. CMA CGM has attached a date, 1 June, and a reason, peak-season ramp-up plus network cost inflation, and no arithmetic behind either. So the work is to test what was printed and discount what was implied.
The filing covers Asia outbound. West Coast 900 per 20ft and 1,800 per 40ft, East Coast 1,050 and 2,100, Asia-Mediterranean 700 and 1,400, all effective 1 June. No bunker line, no port line, no equipment line, no cost build-up of any kind. That absence is itself a datum. An increase with a date and a narrative but no components is a negotiating position wearing a timetable, and the timetable is the only part that cannot be argued with.
Work the ratio, because it is exact. On all three lanes the 40ft is 2.0 times the 20ft. A 40ft carries roughly twice the volume of a 20ft and consumes maybe 1.2 to 1.3 times the slot cost, which is why normal rate cards give the FEU a discount. Here the discount is zero. Per TEU, the levy is identical whether you ship in a 20 or a 40. What has been filed as a container rate behaves as a flat per-TEU charge.
That distinction stops being bookkeeping the moment your fill rate moves. A 40ft loaded to 55% and a 20ft loaded to 90% pay the same 900 per TEU of capacity bought, but the 40ft is moving a fraction of the cargo. The rate card does not notice. Your cost per cubic metre does.
The coast spread is 300 per FEU. 2,100 against 1,800 is 16.7%, and the same 16.7% appears on the 20ft line, 1,050 against 900. An all-water East Coast routing is longer, transits a canal that is not free, and normally prices at a wider gap than that. Three hundred dollars is thin enough to give a clean test. If your inland leg from the West Coast to the same destination costs more than 300 per FEU more than the all-water alternative, East Coast wins on landed cost even after the increase. If it costs less, you are paying a premium for a routing you inherited rather than chose. Very few people run this test. The coast usually gets set by whoever booked the lane last.
Put the number against cargo value, since that is the only denominator finance will accept. 1,800 on a 40ft of electronics worth 80,000 is 2.25% of the goods. The same 1,800 on a 40ft of furniture worth 15,000 is 12%. Identical charge, identical lane, five times the burden. This is why the increase is easy for a carrier to file and hard for a low-value, high-cube shipper to absorb. The box that most needs cheap freight is the box the surcharge taxes hardest. It also tells you where to spend your negotiation. On the 80,000 box, 1,800 is noise. On the 15,000 box it is a margin event, and it is worth a call.
Timing decides how much of this you can avoid. Filed 6 May, effective 1 June, twenty-six days, which sounds like a window and is really three or four sailings. Whether you can use them depends on which date governs the cargo. Booking date, B/L date and on-board date give three different cut-offs, and most tariffs attach to the on-board date, which means a container booked on 28 May and loaded on 3 June pays the increase. Get the governing date in writing before planning anything around it. If it is on-board, your real cut-off is not 1 June, it is the last sailing that loads before it, and that sailing is already filling.
Run a small account. Forty FEU a month to the West Coast, cargo value 50,000 per FEU, capital cost 8% a year. Those last two are my assumptions, not numbers from the release. The increase is 1,800 a box, so 72,000 a month and 864,000 a year. Pulling two weeks of volume forward avoids two weeks of that charge on that volume and costs two weeks of capital on 50,000, which is 154 a box. The rescue pays several times over. The break-even is not where the arithmetic puts it. At 8%, 1,800 is roughly twenty-three weeks of carrying cost, so the arithmetic would let you pre-ship five months out and still win. Warehouse rent, handling and the risk of sitting on unsold stock are what stop you. The increase is the price of five months of capital. It has never been the price of five months of space.
Here is the part no wire story carries. Pre-shipping in a hurry degrades fill, and fill is the denominator of every freight metric you report. If the scramble takes a 40ft from 90% to 55% loaded, freight per cubic metre rises by 64%, same rate, less cargo underneath it. Saving 1,800 on the surcharge while dropping fill from 90 to 55 on the same box is a net loss wherever freight per cubic metre matters more than the surcharge line. The rescue has to be graded, not maximal. Only pull forward volume you can pack properly, and start with what is already packed, already documented, already on the floor.
Assume the increase does not land in full. Filed increases often collect partially, because the filed number is an ask and the market decides how much of the ask survives. Pre-ship hard against 1,800, watch it collect at 600, and you have bought warehouse rent, pulled cash forward and lost fill for nothing. That asymmetry is the whole decision. Pull what is cheap to pull and expensive to leave. Do the overtime arithmetic before you move a production run. The failure mode is treating a filed rate as a fact. It is a forecast with a letterhead.
The trap is not the increase, it is the calendar. May will be spent arguing whether 1,800 is fair, and the argument will consume the twenty-six days in which the answer could have been changed. Fairness is not a rate. The lock point is the last sailing that loads before 1 June on your lane, and everything after it is commentary.
Three lanes, six numbers, one ratio, and a four week argument about a figure that will be negotiated down by people who never opened the filing. The ones who come out ahead will not be the ones who guessed the landing. They will be the ones who knew on 6 May which of their boxes could move.
↑ Back to the key points