Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 8 May, rebuild the spread from your own quotes — same origin, destination, box and commodity — for the three lanes carrying most of your volume; do not use the composite.
- This month, rank every contract in force by signature date; anything older than two quarters goes to the top of the renewal list, with remaining term and minimum-quantity headroom noted against each.
- Before the next negotiation, compute your own break-even in months from spread per FEU, monthly exposed volume and concession per FEU, and refuse any concession that needs more than three months of spread to pay back.
- Cap unpriced volume for the two May sailing weeks at 30 percent of monthly volume; anything above that gets a rate and a named allocation before the first May cut-off.
- Put two clauses in writing before signing — a named allocation per sailing and a credit per roll; a rate without either is an option the carrier holds, not you.
Drewry said the gap between east-west spot and long-term rates widened through April as carriers prioritised profitable peak-season cargo. Shippers on shorter agreements face steeper spot exposure heading into May.
The Analysis
Three sentences from Drewry carry the whole of April. The gap between east-west spot and long-term rates widened. Carriers were giving the sailings to the cargo that paid them best. Shippers on short agreements walk into May carrying more spot exposure than they had in March.
That reads like one number moving. It is two numbers moving at different speeds, measured in different ways, over a basket of lanes that is probably not yours. Before anybody reopens a contract on the strength of it, the arithmetic has to be separated from the narrative.
So we take the spread apart first, then decide whether the line has been crossed.
Begin with what the two numbers actually are. The spot figure is a transaction survey: what was paid, in the week it was paid, on a defined port pair, box size and cargo type. The long-term figure is a contract survey: rates agreed at some earlier point, still in force, averaged across everything signed inside the window the index covers. One updates weekly. The other updates when somebody signs, which is quarterly at best and annually for most volume. Subtracting one from the other is not comparing two prices for the same thing. It is comparing this week's price with the average of decisions taken months ago.
That distinction does most of the work in this story. Where the spot component is firming, a spread against a lagging contract average widens by construction. Nothing has to happen to capacity for the gap to grow. It grows because the denominator is old. Drewry's observation still stands — the direction is real, and carriers giving slots to the best-paying cargo is an allocation statement every shipper should take seriously — but the size of the spread measures how stale the contract book is, not how tight the market is.
The mechanism is worth spelling out because it is not about demand. When capacity is rationed, a carrier sorts by revenue per box per slot. Spot cargo is priced at the margin; contract cargo was priced at a negotiation that closed before the market moved. The carrier does not need to prefer spot cargo. It only needs spot to clear above the contract rate, which in a firming market it does. So the marginal slot goes to the marginal bidder, and the contract holder discovers that a contract rate is a price, not a promise of space.
April adds a second layer. Peak-season bookings for May and June start being tendered in April, and peak cargo is exactly the cargo with a hard date and no tolerance for rolling. That is what makes it profitable in the operational sense: not a higher rate per box on paper, but a shipper who will pay to protect a window. A carrier shifting slots toward that cargo is not being predatory. It is following the allocation rule. The consequence for everyone else is that the rate holds while the service quietly thins.
Who feels this depends on three variables, and rate is only one of them. Volume first. An account moving a few hundred FEU a year on an annual contract with a minimum quantity commitment is largely insulated on price and fully exposed on allocation — its pain arrives as a roll notice, not an invoice, which is why finance teams miss it for a quarter. An account moving twenty to fifty FEU a month on a quarterly agreement is exposed on both, and its renewal lands inside the cycle, which is the worst possible seat. An account buying through a consolidator is exposed twice, because the pass-through lags by a sailing and gets marked up on the way.
Cargo value density matters more than most people admit, and this is where a rate story becomes a margin story. On the same spread per FEU, a shipper of low-value, high-cube goods — furniture, flat-pack, packaging — sees freight as a large share of landed cost, and a 20 percent move in the all-in rate is a genuine cut to gross margin. A shipper of dense, high-value goods sees the same dollars against a much larger cargo value and wonders what the excitement is about. Both are reading the same headline. Only one of them is actually exposed.
Trade direction decides whether the headline applies at all. East-west headhaul is where the rationing happens and where the spread is measured. A shipper on a north-south or intra-Asia lane is reading somebody else's market. The mechanics may rhyme, the number does not transfer, and renewing on a borrowed number is how a procurement team pays for a problem it never had.
The timing is where the spread stops being an abstraction. April index data lands at the end of April. The first invoice priced off the new spot level arrives with the first May sailing, which for most lanes means the second or third week, and payment lands three to six weeks after that. The cash impact is therefore a June event. The decision is a now event, because May capacity is being committed while the April print is still the newest thing on the desk.
The first thing to arrive is not the invoice. It is the roll notice, or a cut-off that moved without explanation, or a booking confirmation that comes back with a later vessel than requested. Those carry the same information as the invoice, arrive four weeks earlier, and cost nothing to read.
Here is the part the coverage leaves out, and it changes the decision. Because the long-term component is an average of contracts already signed, the spread is partly a statement about your own archive. If your contract was signed more than two quarters ago, you are not reading the market. You are reading the distance between today and the day you last signed, and the number is large precisely because you have not been back to the table. That reorders the threshold. The question is not whether the spread is wide; it is whether the spread is wider than the cost of closing it.
We can put a number on that, with the figures mine and not the report's. Assume a contract rate of 2,000 dollars per FEU and a spot rate of 2,400, so a 400 dollar premium, 20 percent. Assume 40 FEU a month on the lane. Left uncovered, the full spread costs 16,000 dollars a month, 48,000 across the quarter. Now price the alternative: a 12-month commitment with a minimum quantity and a 120 dollar per FEU concession that buys a named allocation and a roll remedy. That concession costs 57,600 dollars a year, or 4,800 a month. Divide 16,000 by 4,800 and the break-even is 3.3 months. If you believe the spread persists longer than that, the concession is cheaper than the exposure. If you believe it compresses when May bookings come in soft, the concession is the more expensive of the two and you have bought insurance against your own reading.
The 3.3 months is the number to argue about in the meeting. Not the 20 percent, which is an artefact of the base you happened to pick. Change the concession to 200 dollars and the break-even falls to 2.0 months. Change it to 80 and it stretches to 5.0. The percentage does not decide this. The concession per FEU per month of commitment does.
Three ways it goes wrong. Treating the composite as your lane: the basket weights, port pairs and box mix are fixed and your booking is none of those things, so the first job is always to rebuild the spread from your own quotes. Treating a rate agreement as capacity: a short agreement without a named allocation and a roll remedy is a price with an expiry date, and it fails exactly when you need it. Treating a widening spread as permission to sign anything: the widest point of a spread is frequently the top of the spot move, which makes the renewal signed there the most expensive one available.
Run the counterfactual in both directions. Had carriers not shifted slots toward peak cargo, the spread would have stayed flat, the short agreement would have looked like a cheap hedge, and the shipper would have kept optionality for nothing. Had May bookings come in weak, the spread would have compressed from the top — spot falling while contract held — and the shipper who locked in April would be paying a concession for a problem that dissolved. One condition flips the conclusion: demand in the first half of May. Strong bookings validate the rationing and the gap widens again. Soft bookings reverse it inside two sailings.
Which leaves an operating rule with dates in it. Rebuild the spread on your own lane, in your own box, this week. Price the concession that buys allocation. If your lane's spread exceeds that concession over the remaining contract term, you lock, and you lock before the first May cut-off rather than after. If it does not, keep the optionality and stop calling it a strategy.
The spread is an invoice for how long you have been away from the table. The carriers have been good enough to itemise it.
↑ Back to the key points