← Back to Supply Chain Review

Tag: Long Beach

11 article(s) tagged 'Long Beach'
中文
Port of Los Angeles posts 960,464 TEU in July, its second-busiest July on record
Long Beach Hits Pre-Holiday Peak on Transpacific
Long Beach Eases After Winter Peak as Flows Normalise
Long Beach Posts Strong March as Transpacific Flows Rebound
US-bound frontloading lifts LA/Long Beach throughput to record highs
2026-08-13 · Freight & Logistics
LA/Long Beach Traffic Mitigation Fee Rises 4.77% Effective August 1
US Import Volumes Set for Record July Before Sharp Post-Tariff Drop-Off
US West Coast port dwell drops sharply: Long Beach 4.2 to 2.1 days
Los Angeles and Long Beach post strong June volumes as rates push freight to rail
NRF port tracker sees record 2.47m TEU U.S. imports in July on front-loading
Port of Long Beach Cargo Volumes Jump 31.7% in May, Driven by Front-Loading Surge