Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 3 February 2026, restate the 2,600 on your own basis: ocean freight only or all-in, which surcharges included, port-to-port or door, and 40ft dry or high cube, then recalculate cost per cubic metre and per kilogram for every SKU you ship on the lane.
- By 4 February 2026, compute the break-even cargo value per container as the expected peak-to-trough spread divided by the delay days times your annual capital cost over 365, and sort your SKUs against that line.
- By 5 February 2026, for every SKU above the break-even line, lock the sailing before the peak rather than the rate, and cap any space premium at the spread you expect to capture by waiting.
- By 6 February 2026, confirm in writing whether your service contract prices on booking date, bill of lading date or departure date, and whether the annual reset falls in the first or second quarter, because that date decides whether February matters at all.
- By 9 February 2026, re-quote forward delivery promises on post-holiday transit times and record the trough print as it appears, so the spread you assumed is replaced by one you measured.
Xeneta data shows short-term ocean rates lifted in late January and early February as shippers rushed cargo before the Lunar New Year closure. Far East to North Europe approached $2,600/40ft. The platform warned of a sharp post-holiday drop before recovery.
The Analysis
Xeneta put a number on the board on 2 February 2026. Far East to North Europe short-term rates approached USD 2,600 per 40ft in late January and early February, lifted by shippers rushing cargo ahead of the Lunar New Year closure, with a sharp drop expected after the holiday before any recovery.
Two words in that sentence carry more weight than the number does. Approached is not reached; the print sits below 2,600 and the headline rounds up. Short-term is a segment, not the market; it describes the slice that gets repriced week to week and says nothing about what a contract shipper pays.
So before the figure goes anywhere near a budget it needs a base, a definition and a divisor. A rate per box tells you what a box costs. It does not tell you what a unit of your cargo costs, and those two answers can differ by a factor of twenty depending on what is inside the box.
Start with the definition, because 2,600 could be four different products. Is it ocean freight only, or all-in? If it excludes terminal handling, a bunker adjustment or a peak-season surcharge, then the number a booking system quotes you is already a different figure from the one in the headline. Is it port-to-port, and if so, which North European range: one base port or an inland point several hundred kilometres in? Is it a simple average across bookings or volume-weighted, because a few large contract-adjacent fixtures can drag a simple mean away from what a mid-sized shipper actually pays. And is it a 40ft dry or a 40ft high cube, since the same freight level spread over a different cubic capacity changes the per-unit cost by nearly a fifth before anyone argues about anything.
Now divide it. A 40ft dry holds roughly 58 cubic metres of usable volume and about 27 tonnes of payload, both my assumptions and both normal for general cargo. At 2,600 that is about USD 45 per cubic metre, or about 9.6 US cents per kilogram. A 40ft high cube, call it 68 cubic metres, brings the volumetric figure down to about USD 38. Same freight bill, two different unit costs, and the difference is a choice you make at booking rather than a price the market sets for you.
The part that decides whether any of this matters is cargo value, not freight. At 9.6 cents a kilogram, a commodity worth one dollar a kilogram carries a freight bill equal to roughly a tenth of its value. A component worth twenty dollars a kilogram carries the same freight bill at under half a percent. Identical rate, identical container, one shipper is having a serious margin conversation and the other is not. This is why a lane-level index cannot tell you whether 2,600 is expensive. It is expensive for furniture and ceramics, tolerable for appliances, and rounding error for anything with a chip in it. Volume direction splits the same way. The exporter booking out of Asia pays it as a line item. The European importer receiving the goods absorbs it into landed cost, where it will be compared against a duty rate and a warehousing rate and lose, which is exactly why freight gets negotiated last and regretted longest.
Timing has two lags and people conflate them. The first is contractual: a rate quoted today attaches to a sailing date, not to the day you read about it, and if your booking note prices on departure date then a spike printed this week can be applied to cargo you book next week. The second is accounting: the invoice for a container that sails in early February lands in your cost of goods somewhere between three and six weeks later, which means the peak of the spike and the pain in the P&L are separated by a quarter of silence. The post-holiday drop has the same structure in reverse. The index will show it two to four weeks after the closure, but space loosens faster than the index admits, because the first carriers to discount do not announce it.
We can put a decision rule on this, and the assumptions are mine, not the platform's. Suppose the gap between the pre-holiday peak and the post-holiday trough is USD 400 per 40ft and the time between them is 21 days. On a container of goods worth USD 150,000, carrying cost at 8 percent a year is about USD 690 over those three weeks. Waiting to save 400 costs 690. Multiply by 40 containers a month and waiting saves 16,000 in freight while costing 27,600 in capital, so the arithmetic says ship before the closure, not after. Flip the assumption to cargo worth USD 50,000 and the same 21 days costs 230, which is less than 400, and waiting wins. The break-even sits near USD 87,000 of cargo value per container. Below that line, delay. Above it, pay the peak. That number is the only thing worth arguing about, and it comes from your balance sheet, not from a rate print.
What the coverage will not say is that the level is not the tradable quantity. The spread is, and the spread is partly manufactured by the people quoting it. Every shipper who compressed three weeks of bookings into ten days to beat the closure contributed to the 2,600 they then complained about, and the shippers who did not rush paid it anyway, because they booked into the same peak. A pre-holiday rush is a collective action problem whose bill is split across the whole lane, discipline included. Run the counterfactual and it gets sharper. Had bookings stayed evenly spread, the peak would not have printed and the trough would have been shallower, so a shipper with flexible timing would be roughly neutral, while a shipper with fixed delivery windows would be worse off, because unclustered bookings produce unclustered sailings and carriers void against clusters, not against averages. You are not choosing between a good market and a bad one. You are choosing which end of a spike you sit on.
The trap here is quieter than a surcharge. It is treating a spot print as your cost base and then discovering, at contract renewal, that the number you have been quoting internally for two months was never available to you. Check the renewal date before you check the rate. If your annual contract resets in the second quarter, February is noise. If it resets in March, February is your new floor and the drop you are waiting for arrives one month too late to help. Then fix your trigger, not your opinion: take the break-even cargo value for each SKU, and for anything above it, lock the sailing rather than the rate. Round numbers travel well. 2,600 will be in a slide by Friday, and it will be wrong in a way nobody checks.