Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- Tender all cargo with hard March sell dates before the pre-break cutoff: any SKU with a promotion or campaign date inside six weeks of the intended sailing goes pre-break regardless of the rate premium.
- Hold cargo without hard dates and target the second and third week after resumption, when capacity has restored and rates typically soften; set a walk-away rate of $2,700 per FEU on FBX01 as the ceiling for post-break tenders.
- Confirm empty container availability at your origin ports for the first two weeks after the break, in writing from your forwarders; equipment repositioning, not vessel capacity, is the usual bottleneck after the holiday.
- Get written confirmation of contract versus spot priority on the first post-holiday sailings before the break, not after; if your cargo is spot, secure a booking commitment now rather than competing for restored capacity later.
- Build the carrying-cost comparison into every tender decision: at an 8% annual carrying cost on a $100,000 shipment, three extra weeks of inventory is about $460, against a pre-break premium of roughly $1,200 on five boxes, so run both sides before choosing the window.
The Freightos Baltic Index (FBX) moved +0.7% week-on-week, with transpacific eastbound firming on last pre-holiday tenders. FBX01 (China-East Asia to North America West Coast) held near $2840 and FBX03 (to North Europe) near $2500. Freightos said activity fell sharply during the break and resumed unevenly.
The Analysis
The Freightos Baltic Index moved up 0.7% this week, a number small enough to look like noise on a chart. Underneath it, the transpacific eastbound was firming on the last pre-holiday tenders: FBX01, China to North America West Coast, held near $2,840, while FBX03 to North Europe sat near $2,500. Freightos also said what happens next, and that part matters more than the rate. Activity falls sharply during the break and resumes unevenly afterward.
A 0.7% weekly move is not the story of Chinese New Year. The story is the hole the holiday cuts in the schedule, and the fact that nobody can tell you in advance how deep the hole is on your lane. The rate is knowable this week. The recovery is not.
What follows prices the lane spread, works out what a missed sailing actually costs against the freight it saves, and sets the tender discipline for the last days before the shutdown.
Take the two lane numbers first. FBX01, the China to North America West Coast benchmark, held near $2,840. FBX03, China to North Europe, sat near $2,500. The spread is $340 per box, with the transpacific running 13.6% above the Europe trade, and that gap has been widening through the pre-holiday tenders because the last bookings before the shutdown are concentrated on exactly the lanes that serve March promotion dates. The composite moved 0.7%, but composition is doing the work: transpacific eastbound is firming while other components drift. On a program of 10 FEU a month to the West Coast, the ocean bill is 10 times $2,840, or $28,400 a month, and the weekly 0.7% move is about $20 per box, roughly $200 a month on the program.
That is noise, and treating it as signal is how procurement teams spend a week debating the wrong number. The pre-holiday firming matters less as a rate and more as a reading of where capacity sits: the boats that still have space before the shutdown are filling, and after it they may not sail at all.
Why the market firms in the last pre-holiday week is mechanical. Every shipper with a hard sell date in March is pushing cargo that can move before factories close. Orders that were spread across four weeks compress into the last ten days, tenders spike, and the sailings that remain fill with pre-positioned boxes. Then the schedule thins. Carriers cancel holiday-week sailings, and the vessels that do run carry cargo that was tendered early. After the break, the restart is staggered: factories in different regions return on different timetables, vessel rotations are restored lane by lane, and the first two to three weeks see capacity that is present on some services and absent on others with no pattern a planner can bank on. Freightos put it plainly: activity falls sharply during the break and resumes unevenly. Unevenly is the operative word, because it means your lane's recovery date is a local fact, not a market average.
Who carries this depends on what your cargo is committed to. Importers with March promotion dates, platform campaign schedules, or thin inventory cover are the ones compressing tenders into the pre-break window, and they are the ones for whom a missed sailing is a missed sales week. Replenishment programs running lean feel the same pressure with less warning. Contract cargo gets treated better than spot during the restart: carriers protect their contracted customers on the thin first post-holiday sailings, which means a spot shipper who waited for the post-break window finds the good sailings already committed and the remaining options further out. The ports and lanes where the restart is fastest recover first, and secondary origins wait longest, so two shippers on the same index can have completely different post-holiday realities.
The timing math is where the money actually is. Cargo tendered before the break books the last available sailings and lands on a roughly normal cadence. Cargo that misses the window waits for the first post-holiday sailings, and under an uneven resumption that gap can run one to two weeks longer than the standard four-to-five-week transit planning assumption, an estimate stated plainly. So the practical lead time for post-holiday cargo stretches from about five weeks to six or seven, and the schedule risk lands entirely on the shipper who chose to wait. None of that shows up in a 0.7% index move.
The piece the headline leaves out is the asymmetry between the freight you save and the sales you lose. The rate difference between tendering now and tendering after the break is small: assume, and the assumption is labeled, that FBX01 softens to about $2,600 after the resumption. On five FEU, waiting saves 5 times $240, or $1,200. Now price the other side. Five FEU of retail goods at a $100,000 cargo value and a 30% gross margin carries $30,000 of margin, and if the program slips one week of shelf time, a meaningful share of that margin is at risk.
The insurance costs $1,200 against roughly $30,000 of exposure, a twenty-five-to-one ratio, and yet the standard procurement reflex is to optimize the $1,200 and accept the schedule risk without pricing it. The second omission is equipment. Uneven resumption shows up first in empty container availability, not in the rate index: boxes stranded at destination ports over the holiday take weeks to reposition, and the first post-holiday sailings are constrained by equipment as much as by vessels. A shipper who confirms a booking but cannot get a box has solved nothing.
The counterfactual runs on inventory cover, not on the index. If you are holding four weeks or more of stock and nothing on the book has a hard sell date, waiting is the rational tender: capacity restores, rates typically soften into the second and third week after resumption, and the pre-holiday premium was money you did not need to spend. If your cover is under three weeks, or any SKU has a fixed campaign date, the pre-break tender is cheap insurance and the argument is over. The condition that flips the conclusion is checkable in your own warehouse, not in the Freightos print: count weeks of cover per SKU and sort by sell-date commitment. The other flip is speed of restart. If the resumption comes back faster than uneven suggests, the post-holiday dip never arrives, and the shipper who waited loses both the slot and the rate.
↑ Back to the key points