Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- Do not reprice on the +1.5% composite; pull FBX01 at 2,820 and FBX03 at 2,480 and set the decision on the lane level, which is the only one your invoice will use.
- List every booking with a tender or cutoff date inside the next 10 days and price those separately: they are buying a sailing date, not a rate, and a percentage on a weekly index does not describe them.
- Set the lock line on FBX01: holding above about 2,900, roughly 3% over 2,820, justifies locking the next quarter on that lane; below about 2,740, stay on spot.
- Test the lane split before the next tender round: moving 10 FEU a month between the two lanes is worth 3,400 a month, which is 83% of what this week's index move is worth on a 100 FEU book.
- Write down the two lane levels from this release in your own file today, so that when the post-holiday prints arrive you are comparing against a fixed reference and not against a recomposed sample.
The Freightos Baltic Index (FBX) moved +1.5% week-on-week, with transpacific eastbound firming on last pre-holiday tenders. FBX01 (China-East Asia to North America West Coast) held near $2820 and FBX03 (to North Europe) near $2480. Freightos said activity fell sharply during the break and resumed unevenly.
The Analysis
Freightos printed +1.5% week on week and the story wrote itself as a rate rise. The two lane levels came further down. FBX01, China and East Asia to North America West Coast, near 2,820 dollars. FBX03, to North Europe, near 2,480. Freightos put the firmness down to the last pre-holiday tenders, and said activity fell sharply during the break and resumed unevenly.
My problem with the headline is arithmetic. One point five percent of 2,820 is 42 dollars. On a forty-foot box that is not a rate rise, it is a re-quote. It is smaller than the rounding on most carrier invoices and far smaller than any surcharge anyone has ever argued with me about.
The number worth staring at is not the 1.5%. It is the 340 dollars between the two lanes, which is 13.7% of the lower one and roughly eight times the move that made the headline.
Put a size on the print first. One point five percent applied to 2,820 is 42.3 dollars per FEU; applied to 2,480 it is 37.2. Both sit inside the noise of a normal week, where two forwarders quoting the same sailing routinely differ by more than that, and both are an order of magnitude below the smallest thing a carrier announces as an adjustment. When a weekly move is smaller than the unit of decision it is meant to inform, it is not informing a decision. It is a bar on a chart.
What drove it is in the sentence about tenders, and that sentence is doing more work than the percentage. The firming came from the last pre-holiday tenders, which is a specific kind of transaction. A tender closing before a shutdown is not a buyer acquiring capacity for a delivery need three months out; it is a buyer acquiring a sailing date before a fixed cutoff. That demand is nearly vertical. It does not negotiate, it does not wait for the next print, and it stops at a known hour. A price set by that demand is a deadline price, not a market price, and the two behave differently the week after the deadline.
This is the part I have not seen written. The print carries an expiry date inside its own explanation. The bids behind the +1.5% were tied to a cutoff, and when the cutoff passed those bids stopped existing, not because the buyers changed their minds but because they got their sailings. So the first print after the holiday is not the same measurement on a repaired sample, it is a different population counted at a different size. Freightos saying activity fell sharply and resumed unevenly is the polite version of that. Extrapolating +1.5% forward assumes the buyers who set it are still shopping. They are on the water.
The second thing the coverage skipped is the spread. 2,820 against 2,480 is 340 dollars a box, 13.7% of the lower lane, and the weekly move was 42. The lane decision is worth about eight times the market decision, and every reader is being pointed at the 42. If you run a mixed book, the question that repays attention this week is not whether the index reaches +2%. It is how much of your volume sits on which lane, and whether that split is a decision or an inheritance from last year's supplier list.
Who feels this. On the transpacific eastbound, anyone booking spot for the next two to three weeks is the audience the +1.5% is addressed to, and it is 42 dollars a box, so on 20 boxes a month it is 840 dollars, a rounding line in a freight budget. On the North Europe lane the firming was not the driver, so your exposure is whatever the sample did, and I would not treat a residual as a signal. On fixed contracts nothing arrives until renewal. Anyone who has already tendered the first half of the year is watching a spectator sport with a small entrance fee.
Timing. Spot priced off this week hits the invoice in one to two weeks, since you book this week and sail next. An index link takes it at the reset, and if that reset is monthly, the February print will be competing with a March print describing a post-holiday sample, so this firming may never be paid by anybody. Fixed contracts meet it at renewal. The recovery the release calls uneven tells you the counts are not repaired, and I would allow two to four weeks before they are comparable again. That two-to-four is my assumption and not a published figure, but the mechanism behind it is plain: a sample has to be full before its level means anything.
A calculation, assumptions stated. Take 100 FEU a month, 70 on the transpacific lane at 2,820 and 30 on North Europe at 2,480. Weighted average is 0.7 times 2,820 plus 0.3 times 2,480, which is 2,718. Apply the 1.5% to the two lane levels and the monthly bill moves by about 4,077 dollars. Now move 10 FEU a month from the Europe lane to the transpacific lane and the bill moves by 3,400 dollars, which is 83% of the entire monthly value of the rate move, produced by a routing decision rather than by the market. That is the argument in one line. The volumes, the split and the shift are mine; the lane levels, the 1.5% and the tender explanation are the release's.
The trap is treating a deadline price as a trend. Buyers who chased the +1.5% in the final pre-holiday window paid for a sailing date, and then booked against a level set by people who were not shopping on price. The counterfactual is quiet: had you booked a week earlier or a week later on this lane, the difference would have sat inside the spread between two quotes. What was never quiet is the 340 between lanes, which nobody was putting in a headline.
Where I put the line is on FBX01, not on the composite. If it holds above about 2,900, roughly 3% over 2,820, the post-holiday market is carrying the deadline price forward and I would lock the next quarter on that lane. If it slips under about 2,740, the +1.5% was a cutoff artifact, stay on spot and spend the meeting on the spread instead. One and a half percent is a rumour with a percentage sign attached. Three hundred and forty dollars is a decision. The index moved 42 dollars a box and the trade press moved rather more than that.
↑ Back to the key points