Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- Build a two-line weekly series for every lane you buy, plotting announced FAK against your own paid rate, and review the gap every Monday starting the week of 9 November.
- Add a market-test clause to every contract that references a carrier's published rate, resetting the reference whenever it sits more than an agreed percentage above a named index or a three-carrier average.
- For cargo moving before 25 November, request the named week 46 open rate in writing on the specific sailing you need, with equipment and cut-off attached, rather than negotiating from the announced level.
- Collect live quotes from at least three carriers per active lane by 20 November, and route flexible volume to the lowest credible quote while keeping your premium carrier for time-critical cargo.
- Rehearse the boundary: if week 47 prints above 3,000 dollars and week 48 holds, convert your spot volume to a short fixed deal within 48 hours; if week 47 breaks toward 2,800, hold spot and re-quote weekly.
Maersk published a November first-half FAK rate of 4,000 dollars per FEU from Shanghai to Rotterdam effective November 2, but week 45 open rates settled near 3,200 dollars, roughly 800 below the announced level. Week 46 quotes slid further to about 3,000 dollars, a second consecutive weekly decline, per Chinese freight market reports. CMA CGM quoted 3,400 dollars against an announced 4,400, while Yang Ming released some sailings at 2,400 dollars, the lowest FAK seen this cycle.
The Analysis
A rate announcement is not a rate. Maersk published a November first-half FAK of 4,000 dollars per FEU from Shanghai to Rotterdam, effective November 2. Week 45 open rates settled near 3,200. Week 46 slid to about 3,000, a second consecutive weekly decline. Announced and transacted are a thousand dollars apart, and that gap is the whole story.
I have read a lot of these hike letters. I have never once watched an announced number survive contact with a soft market for more than a fortnight. What survives is the letter itself, because it teaches everyone to negotiate from the wrong starting line.
So we pull the two numbers apart and ask which one your freight bill is actually built on.
Take the announcement first, because the announcement has a job.
Maersk put 4,000 dollars per FEU on Shanghai to Rotterdam for the first half of November, effective the second. That is a published FAK, the rate for cargo with no contract and no agreed quantity, the walk-up price. Publishing a peak-season level two days into the month does two things at once. It sets an anchor for every conversation that follows, and it gives the sales desk a legitimate reason to quote high to anyone who has not done their homework. The announcement is a negotiating instrument dressed as a price.
Now the market. Week 45 open rates near 3,200, which is 800 below the announced level, or twenty percent off. Week 46 around 3,000, which is another 200 lower, or six point three percent off week 45 and twenty-five percent below the announced number. Two consecutive weekly declines is the part that should stop you, because a rate that falls twice in a row is not a rate finding its level; it is a rate that never had one.
Widen the lens and the picture gets sharper. CMA CGM announced 4,400 and quoted 3,400, a shortfall of 1,000 dollars, or twenty-two point seven percent. Yang Ming let some sailings go at 2,400, which is 1,600 below the Maersk announcement and a full forty percent under it. That 2,400 is the most informative number in the whole set, and it is the one nobody puts in the headline. When a carrier drops a sailing to 2,400 on the main east-west lane, that carrier is buying volume with price, which means it has a position it needs to fill and it has decided that a slot filled cheap beats a slot sailed empty.
So the spread inside one trade, in one fortnight, runs from 2,400 to 4,400. That is not a market moving. That is three different sales strategies firing at once, and the load-bearing variable is who is short of volume and who is not.
Here is the arithmetic that matters to your side of the table. Suppose your annual contract indexes to the announced FAK level, which is common in deals where the reference is written as the carrier's published rate plus or minus a discount. If the reference is 4,000 and the real market is 3,000, then a five percent discount off the reference lands you at 3,800 against a market of 3,000. You did not negotiate a discount. You negotiated a premium and called it a discount. On a lane where shippers move the equivalent of twenty thousand FEU a year, the 800 dollar gap is sixteen million dollars of annual exposure, and the discount you fought for bought back four hundred thousand of it. Every hour spent arguing about the discount percentage while the index base is wrong is an hour spent on the wrong number.
Now the part the trade press skipped, and it is the reason two consecutive declines are a bigger signal than the outright level.
Take the definition apart first, because the words are doing work. FAK means freight all kinds, one rate for all cargo types on that lane, no commodity discrimination. It is not a contract rate and it carries no volume commitment. The open rate is the number a booking desk will actually confirm for a sailing this week, after equipment availability, cut-off and the load list are all real. So an announcement is a statement of intent ahead of demand, and an open rate is a statement of reality inside demand. When the two diverge, the open rate wins, every time, because it is the one that clears the booking.
There is a structural reason the gap can get this wide, and it is not just soft demand. A carrier announcing 4,000 is pricing the lane as if capacity is scarce. A carrier quoting 2,400 on a few sailings is pricing the marginal slot as if it is abundant. Both can be true on the same route in the same week, because the constraint is not the average utilisation, it is the utilisation of specific sailings. A vessel that is ninety-five percent full on Tuesday and sixty percent full on Friday will produce an announced rate that reflects Tuesday and an open rate that reflects Friday. The lane does not have one price right now. It has a distribution, and the announcement simply picks the top of it.
Add the surcharge layer and the true ranking can flip. FAK is normally quoted base, with GRI, PSS, BAF and terminal charges stacked on top. If one carrier folds a peak surcharge into a higher base and another keeps a lower base and bills the same surcharge separately, the two arrive at similar all-in numbers while looking 500 dollars apart on the letter. Two shippers comparing only the headline FAK can conclude that one carrier is cheap and the other is expensive when the all-in figures are within two percent. The reverse also happens: the headline that looks cheap carries a surcharge schedule that catches it back up by the time the container is on the water. So when you compare announcements, compare all-in, door to door, with the same equipment and the same free time. Anything else is comparing typography.
One more layer, and this is where small shippers lose the most. Peak season surcharges are usually assessed per container or per weight, and they are frequently applied at the time of the shipment rather than at the time of booking. So a rate you booked at the end of October can carry a PSS that did not exist when you signed off on the quote, and the invoice you receive in December no longer matches the number you planned against. The announcement gets the attention; the surcharge does the damage. Track both, and track them on the same booking reference so you can see where the gap between planned and paid actually opens up.
Now the ordinary arithmetic on your side of the table, which is where this gap stops being interesting and starts being expensive.
A published FAK that holds is a threat with teeth: it tells you that if you do not contract, you will pay the walk-up price, so you had better sign. A published FAK that gets undercut by twenty to forty percent within two weeks is a threat with the safety off. It tells every buyer in the market that the walk-up price is a fiction, and once that is common knowledge the carrier cannot use it as leverage again until the next cycle. The mechanism is the same as any advertised price that the shop itself quietly ignores: the moment customers learn it is not real, the announcement stops doing work and starts doing damage, because it signals that the carrier is long on capacity and short on arguments.
Watch what that does to the contracting calendar. The usual script is that a hike letter in early November gives the desk cover to push annual agreements up at renewal. If the hike collapses within a fortnight, the renewal conversation flips to the buyer. A freight buyer who understands this does not wait for the carrier to blink; the blink has already happened, it is just not printed. The evidence is right there in the week 46 number.
There is a second-order point about who pays the difference, and it is not who you think. Large volume buyers rarely pay the announced number, because they have people whose job is to know the open market. Small and mid-sized shippers, buying through a forwarder or a spot platform, often do pay close to it, because they treat a published rate as the rate. So an announcement that the market ignores is not a wash. It is a transfer from the least informed buyers to the carrier, and it works precisely because the information is asymmetric and the smaller party does not know the gap exists. The published number is not neutral. It is a screen that catches the people who cannot see behind it.
Time is the next thing to pin down, because the value of this gap is perishable. The decline from 3,200 to 3,000 happened in a single week. That is the speed of the transmission right now, which tells you two useful facts. One, the announced level had no inventory of commitment behind it; it was a fresh attempt and it was being repriced session by session. Two, the window in which you can buy at 3,000 is not a month wide, it is a week or two wide, and it will close in one of two ways. Either demand firms into December and the carriers recover the pricing power to make a hike stick, or the empty sailings and capacity discipline of the past few weeks finally bite and pull supply down to meet the announced number. Either way the 3,000 you can book today is a temporary gift, and temporary gifts have a settlement date.
Look at the slope rather than the level, because the slope tells you how long your window lasts. From 4,000 announced to 3,200 realised is 800 dollars across roughly one week from the effective date. From 3,200 to 3,000 is another 200 in the following week. That is a decelerating decline, which matters more than it looks. A decline that is slowing is a decline that is approaching something, and the something is not zero. A carrier will not sail below the cash cost of a westbound leg plus the empty repositioning it has to fund, and the Yang Ming print at 2,400 is the closest thing we have to a visible floor for this cycle, because it is the lowest number anybody has confirmed in the open market.
So the useful mental model is a band, not a trend: the announcement is the ceiling, the cheapest confirmed sailing is the floor, and the open rate wanders inside it week to week. Your job is to know both walls before you book, and to know which wall is moving.
Take the second-order effect on your own book and the picture gets concrete. Say you move 2,000 FEU a year on Asia-Europe, split fifty-fifty between contracted and spot. On the contracted half you are exposed to whatever the index base says. On the spot half you are exposed to the open market this week. If you anchor the contracted half to an announced 4,000 and the spot half is clearing at 3,000, you are running two very different cost bases on the same lane inside the same month, and your landed-cost model is quietly wrong on one of them. When you re-plan a promotions calendar or a replenishment cycle, that inconsistency shows up as a margin surprise in one product line and not another, and it looks like a demand problem when it is really a reference-price problem. Fixing the reference is a week of contract work. Fixing the margin surprise after December is a quarter of firefighting.
Take the other side seriously, because a one-directional read is how people get hurt. If the carriers blank enough sailings, the announced 4,000 can become real, and everyone who waited gets 4,000 or worse. That is not a small risk. Through the same window, Asia-Europe saw 34 blanked voyages out of 713 advertised, and takeaway capacity on a lane is what makes a hike stick. The question to answer is not whether the announcement is honest today. It is whether supply gets pulled hard enough before your cargo moves. If you are shipping in the second half of December, you are betting on a soft market three weeks from now, and that is a different bet from shipping in the next ten days.
So the boundary condition is clean. If week 47 prints above 3,000 and week 48 holds there, the floor has formed and the announced level is at least pointing the right way. If week 47 breaks toward 2,800 with Yang Ming-style sailings multiplying, the floor has not formed and the next announcement is a marketing document. Watch those two prints and you will know which market you are in before your next booking window closes.
Pull the two lines together into one chart and the shape is almost funny. The announced line is a clean step up to 4,000 and it stays there, flat, because nobody updates a press release. The transacted line is a slope going down, 3,200 then 3,000 then who knows. The vertical gap between them is not noise and it is not a rounding difference. It is the space you negotiate in, and every dollar of it is yours if you insist on anchoring to the transacted line instead of the announced one.
One more angle on the outliers, because the numbers tell a story about carrier strategy that the level alone hides. A single carrier at 2,400 while another announces 4,000 is not two carriers disagreeing about the market. It is two carriers in different inventory positions. The one at 2,400 has ships that must sail and has decided the marginal box is worth more than the marginal dollar, which is the classic move of an operator with a weak backhaul or a new service it needs to fill. The one at 4,000 has a book it believes it can fill at a premium, or a brand position it is defending. Your job is not to guess which one is right. Your job is to notice that both are available to you, and to book accordingly, taking the cheap slot where your schedule allows and keeping the premium carrier for the cargo that genuinely cannot tolerate a missed week.
Now the practical shape of it.
Take your own booking history and split it two ways: what you actually paid, per lane per week, and what was announced. Most teams keep the second number because it comes in a nice email and never keep the first because it hides in a payment run. That asymmetry is exactly how a shipper ends up negotiating against the wrong baseline for a year. Build the paid series, and the announcement series beside it, and the gap becomes a number you can defend in a review instead of a feeling you argue about in a meeting.
Then re-cut the contract language. A clause that references the carrier's published rate without a floor or a market test is a clause that transfers the risk of the announcement to you. Put a market check in it: if the published reference sits more than some agreed percentage above a named index or a three-carrier average, the reference resets. That single sentence moved sixteen million dollars of exposure in the arithmetic above, and it costs nothing to write.
For the volume that has to move in the next two weeks, do not accept the announcement as the opening bid. Ask for the week 46 open rate by name, on the specific sailing you need, and get it in writing with the equipment and the cut-off attached. The open rate is the market, and the market is lower than the letter.
And keep a live comparison across at least three carriers per lane you actually use. The 2,400 outlier was visible to anyone asking three desks instead of one. Asking one desk and reading one press release is how you pay 4,000 in a 3,000 market.
The gap between a stated price and a settled price is the most useful thing a freight market ever shows you. Right now it is a thousand dollars wide on Shanghai to Rotterdam, and it has been widening for two weeks. Take it, and take it before the floor shows up.
↑ Back to the key points