← Back to Supply Chain Review Ports & Infrastructure

Panama Canal to cut Neopanamax draft to 48ft on Aug 26 and 47.5ft on Sept 3

Source: Panama Canal Authority · 2026-08-19 · 1 min read
中文
Summary

The Panama Canal Authority has told shipping lines the maximum authorised Neopanamax draft will fall to 48 feet (14.63m) from 26 August and 47.5 feet (14.48m) from 3 September - the fourth and fifth cuts of this cycle - citing Gatun Lake levels and El Nino risk. Daily transit numbers are unchanged for now, so the immediate effect is reduced payload, not fewer slots. Carriers have already filed transit surcharges of $200-$1,000/FEU.

panama canaldraft limitsel ninopayload