← ← Back to Supply Chain Review
Ports & Infrastructure

Long Beach Eases After Winter Peak

Source: Port of Long Beach · 2026-01-06
Summary

The Port of Long Beach eased after a winter peak as transpacific flows normalised post-holiday. Terminal operators said productivity gains from underway modernisation helped keep congestion at bay.

Read original article →