Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 13 February, split every open order into two lists, one that needs 40ft and one that can take 20ft, and price the 20ft version at 1.45 per unit of cargo rather than at the quoted rate.
- Book written pick-up windows for the two weeks before the closure, one slot per truck per day, and hold a 15% daily buffer for re-slots.
- Approve substitution to two 20ft only where the 40ft delay would cross a gate cut-off; otherwise wait up to 48 hours, and log the decision with the cut-off date attached.
- Get the depot's daily pick-up quota in writing before 20 February and check it at 08:00 every morning while the quota sits below your loading plan.
- Before 24 February, secure equipment for the first two post-holiday sailings on the assumption that the pool stays short until empties return, and do not plan the reopen as a normal week.
The Loadstar reports container equipment tightened at Chinese load ports ahead of the Lunar New Year closure, with 40ft boxes scarce as exporters rushed out cargo. Depots near Yantian and Ningbo rationed pick-ups to keep flows moving.
The Analysis
The Loadstar reported on 10 February that container equipment tightened at Chinese load ports ahead of the holiday closure. 40ft boxes turned scarce as exporters rushed cargo out, and depots near Yantian and Ningbo rationed pick-ups to keep flows moving.
No freight rate is quoted anywhere in that report, and the absence is the point. This scarcity is not being cleared by price. It is being allocated by queue.
Rationing is also unusually informative. It tells you where the binding constraint sits, and it is almost never where the first phone call goes.
Read the verb. Rationed. A price clears a market; a ration allocates one. When a depot caps pick-ups, the queue becomes the price, and the queue is paid in days rather than dollars, which is why it never appears in a freight quote and always appears as a missed sailing.
Start with which box is short, because the two answers have different cures. It is the 40ft, not the container. Exporters rush the same cargo in the same week and the mix they demand tilts toward the biggest unit, since per-box charges are per box and everyone minimises the count. A fleet's 40ft share cannot be re-cut in seven days. You can therefore stand in a yard full of 20ft and still be short of what you need. The honest question is not how many boxes are available, it is how many of the right ones are, and those are two shortages with two very different fixes.
The obvious substitute is two 20ft for one 40ft, and on the rate sheet it looks close to free. Below the rate sheet it is not. Every per-box charge doubles: terminal handling, documentation, weighing, chassis, drayage moves, and the customs entries if the consignment splits across two declarations. Usable cube drops as well, because two 20s carry less than one 40. So the same cargo pays twice the fixed stack to move slightly less of itself. Freight per unit of cargo barely moves. Everything underneath it moves a lot.
The second cost is the clock, and the clock starts at the gate. Detention begins when the box leaves, not when you intended it to leave. A pick-up pushed back two days leaves two choices: compress stuffing into two days, which means night shifts, missed truck slots and a VGM or gate-in taken under time pressure, or accept a later vessel. Free time at the far end does not move. Two days at origin become two days of exposure at destination, priced at destination rates, which are never the cheap ones.
Who pays. A factory with its own trucks and a standing depot relationship treats this as a scheduling problem and solves it with phone calls and a night shift. A trading company buying FOB hands the box problem to the supplier and feels nothing, until the supplier adds a surcharge or misses the cut-off, and then it arrives as a claim rather than a cost, which is worse, because claims get argued and costs get absorbed. An importer on CIF terms feels nothing directly, and that is the problem: the cost comes in inside the price, averages itself into landed cost, and never gets examined on its own.
The tell is the first pick-up that gets a number instead of a yes. When the depot stops saying tomorrow and starts saying the fourteenth, the constraint is already binding and the queue is longer than your loading plan. The bill arrives on a later sailing's invoice, one to two weeks after the friction, and that gap is where people conclude that nothing happened.
Two things sit outside the report. A rationed gate is a cap on transactions per day, and a transaction is a truck, so the constraint may be the trucking capacity feeding the depot rather than the steel on the ground. If that is the case, hunting for boxes is a search in the wrong direction and flattening your pick-up curve is the right one, which is worth knowing because a flat curve is bought with a schedule, not with money. The second thing catches nearly everyone: 40ft scarcity at the load port does not end when boxes are found. It ends when the return flow resumes, meaning empties coming back from the destination side after the holiday. Until the first post-holiday vessels discharge and de-hire, the pool stays short. The two weeks after the closure are usually tighter than the last week before it, and almost every plan covers the closure while almost none covers the reopen.
Normalize one 40ft as the unit of capacity. Assume the per-box fixed stack of handling, documents, weighing, chassis and drayage runs at 0.18 of the ocean freight, and that two 20s cost 1.10 in freight together while carrying 0.9 of the cargo. Both are my assumptions, not figures from the report. One 40ft then costs 1.18 per unit of cargo. Two 20s cost 1.32 in total charges across 0.9 of cargo, which is 1.47 per unit, roughly 24% more for slightly less cargo. Against that, waiting two days for a 40ft costs two days of delay and nothing else. On a replenishment cycle, two days is almost always the cheaper number.
Flip it and the answer changes. If those two days push you past the gate cut-off, waiting stops being cheap and becomes a missed sailing, and substitution turns into the cheaper option. So the only question worth answering is whether the delay crosses a cut-off, and it should be answered in writing before the depot answers the phone, because once the queue is twenty trucks deep the answer has already been made for you.
The trap here is treating equipment as a freight event and calling the carrier. The carrier is not allocating boxes; the depot is rationing gates, and a booking you cannot fill is not capacity, it is a reservation with a penalty attached. The box is not missing. It is three hundred metres away, behind a gate that opens for a fixed number of trucks a day. Lock the pick-up window before you lock the sailing.