Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 12 February 2026, pull the transit assumption out of every open quote and mark which ones were built on the diverted routing rather than a shorter one, so the assumption stops being invisible.
- By 20 February 2026, resize safety stock on the actual door-to-door spread of your last eight sailings rather than the booked transit, and set the buffer at the 80th percentile of that spread.
- Put a transit-adjustment clause into every contract renewing in the first quarter, with freight re-set on a published transit basis so the benefit of a shorter routing passes to whoever paid for the longer one.
- State the carrying cost in one line per lane at your own cargo value: below 0.5 percent of landed cost it is noise and should be left alone, above 2 percent it belongs in the pricing conversation.
- From 16 February 2026, check diversion status weekly and pre-book the first two sailings after any normalisation, because that is where the schedule reset lands.
Lloyd's List reports Red Sea diversions persisted through the Lunar New Year lull, with most Asia-Europe loops still routing via the Cape of Good Hope. Operators said the longer transit buffered the holiday capacity hit by spreading sailings.
The Analysis
Two words in that report are doing all the work: buffered, and spread. Both are accurate. Neither is a number. When a diversion is described as having buffered a capacity hit, the thing being protected is a utilisation figure, and the thing paying for it is somewhere else on somebody's balance sheet.
I want to be careful here, because this is the kind of sentence that gets read as good news. It is not good news. It is a description of who is currently holding the inventory.
Most Asia-Europe loops are still going round the Cape through the lull. That is the fact. What follows is what the routing is charging you while it lasts, and what it will charge you when it stops.
A longer round voyage does exactly one thing mechanically. It takes a fixed fleet and turns it into fewer sailings per unit of time, or it takes a fixed sailing schedule and turns it into a larger fleet requirement. You cannot keep both the frequency and the vessel count when the distance grows; the schedule has to give somewhere. So spreading sailings means the same tonnage is now spread thinner across the calendar, which is precisely what an operator wants when demand drops for a fortnight. The hole gets covered by the calendar instead of by the balance sheet. That is a real and rather elegant piece of slot management. It is also not a saving for anyone downstream.
Buffered is the more slippery word, because it hides a choice about where to put the damage. A capacity hit can be absorbed in three places. It can be absorbed in the utilisation number, which is what the report describes. It can be absorbed in the schedule, which you see as longer transit and different arrival days. It can be absorbed in the shipper's inventory, which is invisible unless you go looking, and which is the only one of the three you actually pay for. Reports describe the first because it is the one with a public number attached. You live with the third. Between those two sentences there is an entire working-capital discussion that nobody has had.
Who is carrying it matters more than how big it is. A buyer working to a fixed landed cost with a fixed lead time carries the extension as a silent margin squeeze, and finds out when a customer asks why the delivery moved. A seller who quoted a door-to-door transit before the diversion was extended carries it as a service failure, because the quoted number is now a promise they cannot keep. A buyer who re-forecasts every month absorbs it as extra safety stock, which is a real cost and an easy one to leave out of a lane profitability review. The party that does not carry it is the carrier, whose utilisation is the number being defended. This is not a complaint about carriers. It is just accounting: somebody's asset utilisation is somebody else's inventory.
Timing is where people get this wrong, and it is not the timing they expect. The lull is the quiet part, and the quiet part is exactly when the routing looks settled and the decision looks unnecessary. Diversions persisting through a lull is not evidence of stability. It is evidence that nobody has had a reason to revisit the routing. When the unwind comes it will not arrive as a rate cut on day one; it will arrive as a schedule reset, and a schedule reset is paid for in the first fortnight, when the strings are out of position and the first sailings after the switch are the ones that slip. So the relief, when it comes, will be preceded by a service dip. Plan for the dip being first.
This is the point I would put in front of a board and nowhere else. This buffer has no notice period. A diversion is a routing decision, routing decisions are made in a room you are not in, on a timetable you do not see. The buffer is therefore not an asset you hold. It is a condition you are currently benefiting from, and you cannot contract for the continuation of a condition. You can only contract for what happens if it stops.
There is a second asymmetry, and it is the one that will be misread. When transit lengthens, the utilisation figure improves, because tonnage gets consumed in the water. When transit shortens, the same tonnage returns to the pool at once, on a schedule set by somebody else, and the utilisation figure deteriorates for reasons that have nothing to do with demand. So the rate consequence of a Red Sea normalisation is not a demand story. It is a supply release story, and it will be reported as a demand story by everyone reading only the utilisation line. That misreading is the risk I would actually hedge, because it will move rates in a direction that has nothing to do with whether your customers are buying.
Put a number on the part you pay. Assume, and these are my assumptions rather than reported figures, a cargo value of USD 60,000 per FEU and a carrying cost of 20 percent a year. That is 60,000 times 0.20 divided by 52, or about USD 231 per FEU for each week of added door-to-door time. If the diversion adds one week to what you actually experience, and you move 40 FEU a month, that is 231 times 480, or roughly USD 111,000 a year in carrying cost alone. Two weeks makes it about USD 222,000. Neither figure includes the safety stock you added because arrival dates got noisier, and neither includes the demurrage when two sailings land in the same week and the yard cannot take both.
The useful conclusion is not that the diversion is expensive. It is that the expense is legible, per FEU, per week, and therefore contractible. A cost you can express per unit per week is a cost you can put in a clause. That is a much better position than arguing about freight levels after the fact, because freight is negotiated and transit is assumed. Nobody negotiates transit. Everybody assumes it, and then everyone discovers it at the same time.
The mistake I would expect here is treating the current routing as the baseline. Quotes get built on it, lead times get promised on it, safety stock gets sized on it, and then it becomes the reference point against which a normalisation looks like a disruption. That is backwards. The diverted routing is the anomaly. Build your numbers on the shorter routing and take the longer one as the surcharge, and you will be the one who gains when the Cape empties out, instead of the one who discovers the schedule moved.
A routing decision someone else makes is the cheapest risk there is to hedge and the most expensive one to ignore. Lock the transit assumption, not the rate, and do it in the last week of the lull, while everyone is still calling it a lull. After the first schedule reset, you are not negotiating an assumption. You are negotiating a loss.