Read this first — the conclusion, and the moves to make:
- By April 24, put second-quarter volume against committed space lane by lane; the uncovered share is the only number the May 1 step actually applies to (logistics manager).
- Lock the uncovered share before April 30, split into at least two tranches so a demand miss lands on part of the book rather than all of it (booking desk).
- Write the roll and deadweight terms into the commitment before signature, including how unused space carries forward and at what cost (procurement, at signature).
- Set a walk-away trigger in advance: if FBX01 rises more than 3% in a single week, about $89 on the current $2,960 base, commit the remaining uncovered volume the same day without further analysis (management, standing rule).
- Track liftings against commitment weekly; two consecutive weeks below 90% of plan is the trigger to reopen the commitment rather than absorb the deadweight (operations, weekly).
The Freightos Baltic Index (FBX) rose 1.2% week-on-week, led by transpacific eastbound. FBX01 (China-East Asia to North America West Coast) held near $2960 and FBX03 (to North Europe) near $2565. Freightos noted that Q2 contract volumes and measured capacity kept rates buoyant, with shippers increasingly locking committed space ahead of May 1 carrier increases.
The Analysis
One point two percent. On FBX01, China and East Asia to North America West Coast, that is $35.52 a box against a print near $2,960. On FBX03, the same origins to North Europe, near $2,565, the same headline works out to $30.78. Two numbers, one headline, and neither of them is the number on your invoice.
The Freightos Baltic Index rose 1.2% week on week, led by transpacific eastbound. Freightos puts the hold down to second-quarter contract volumes and measured capacity, and reports shippers locking committed space ahead of May 1 carrier increases.
I am not going to argue with the 1.2%. I want to establish what it is a percentage of, because that determines whether it deserves ten minutes of your week or none.
Two prints, four numbers, one spread. FBX01 sits near $2,960. FBX03 sits near $2,565. Subtract and you get $395, which is 15.4% of the lower base. That difference is the price of choosing the Atlantic-facing lane over the Pacific-facing one from the same origin. Everything else in the release is a percentage laid on top of those two levels, and levels are what you pay. The 1.2% is the derivative. The $2,960 is the function.
The causal chain is worth spelling out, because it runs backwards from how it reads. Second-quarter contract volumes mean a large share of the cargo that will move in April, May and June is already committed at agreed rates. Measured capacity means ships are being added in doses rather than batches. Put those together and the freely tradable part of the market, the spot boxes, is a thin slice of a much larger book. Thin markets move on small orders. A carrier that knows most of its book is contracted does not have to chase the remainder with discounting; it can hold and wait. That is the mechanism behind 'buoyant'. Nobody is describing demand strength. They are describing a balance in which the marginal seller has no reason to blink.
The anticipation layer is what actually explains this particular week. Shippers are locking committed space before May 1. Locking is a purchase, and purchases made in anticipation of a price increase are themselves a source of price increase. The index rises because the act of preparing for the rise removes capacity from the quotable market. All of that can happen with no change in the volume of goods moving: a financial behaviour showing up in a physical index.
Who feels it depends almost entirely on how much of the book is already closed. A large importer that signed a second-quarter allocation in February is insulated until renewal, and its exposure is a third-quarter negotiation rather than this week's problem. A mid-size importer running month to month is exposed on every box immediately, and has no leverage to refuse a May step, because refusing means no allocation. An exporter who quoted a delivered price in March on cargo that sails in May has already sold the exposure and now owns it outright; that is the worst position in the chain and the most common one. Inside the index the pressure is uneven too: transpacific eastbound led, while North Europe sits $395 below on the same origin, so a shipper with routing flexibility holds a real and quantifiable alternative that a pure transpacific shipper does not.
Timing here is more mechanical than people assume. The index prints weekly, so this figure describes a week that has already closed. The commitment window runs to April 30 and does not widen; space locked in the last week of April is space somebody else did not lock. The first invoice carrying a May step is for a sailing on or after May 1, and it reaches payables thirty to forty-five days later, in late May or June, long after the decision that caused it. The contract clock is separate and slower: second-quarter volumes were priced before this buoyancy, so the next genuine repricing point for a contracted shipper is the third-quarter negotiation. Two clocks, and the one that costs cash is the fast one.
Here is the part the release does not say. The index is a port-to-port benchmark. Your invoice is door-to-door. The 1.2% applies to a base smaller than the one you pay on, and the difference, the inland leg, the terminal handling, the documentation, the chassis, is not indexed at all, which means it is also not capped by anything. Run the same problem in the other direction and it reappears: a 1.2% weekly move, compounded over a year, is 86%. Nobody believes next April's rate is 86% higher. The compounding is the tell. This weekly percentage is a delta on a basket, not a rate of change you can project. As a reading it is useful. As a trend it will make you hedge the wrong risk.
Arithmetic, assumptions stated. Call it sixty FEU a month, forty percent of it uncovered and therefore priced off spot: twenty-four boxes. At $35.52 a box, one week of this move costs $852. Across the four weeks to May 1, if the pace held exactly, that is $3,410. Now put a second denominator underneath. Assume $60,000 of goods per FEU, which is my assumption and not a figure from the release. Sixty FEU is $3.6 million of goods a month. $3,410 against $3.6 million is 0.09%. Against the freight line alone, the same move is 1.2%. Both are correct. Which one you quote decides whether you spend this week renegotiating or reviewing something else, and for most importers the honest answer is that the freight percentage governs the cash while the goods percentage governs the mood.
The counterfactual is not lock or do not lock. It is lock, or buy the step at spot and lose your place in the queue. Doing nothing is not neutral here; it is a purchase of the step at an unknown price with no allocation behind it. The opposite error is worse in a specific way: locking volume you cannot lift turns a rate decision into a deadweight bill, and deadweight is charged whether or not the cargo exists. What fails is rarely the rate. It is the ratio between committed and actual liftings, a number you can measure weekly and almost nobody does.
My rule for this week is unromantic. If the May step is larger than the annualized value of two weeks of index drift, and it will be, then the index is entertainment and the commitment is the decision. Lock the uncovered share before April 30, in tranches, with the roll terms written down before signature instead of argued after it. Watch liftings against commitments weekly, and read two consecutive weeks of under-lifting as a signal to reopen the commitment rather than to keep paying for air.
A 1.2% week is a rounding error wearing a trend's coat. The step it is warning you about is not.