Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 15 May, replace the 2,970 composite in your budget with your own lane print and rebuild the model at 3,650 for transpacific eastbound and 3,030 for North Europe.
- By 22 May, get the June increase's effective date and its basis in writing: percentage of which base, and which surcharges it stacks on top.
- Lock volume carrying a contractual delivery date before the effective date; leave volume on spot only where one week of roll costs under 5% of cargo value.
- Report freight per unit monthly as rate divided by units shipped, with the fill factor printed beside it, and treat any month below 85% fill as a rate increase you gave yourself.
- Cap the premium you will pay for a three-month lock at 2% of the current lane rate; above that, shorten the commitment rather than accept the price.
The Drewry WCI composite index rose 3% week-on-week to $2,970 per 40ft container for the week ending May 7. Shanghai-Los Angeles gained 4% to $3,650 and Shanghai-Rotterdam rose 3% to $3,030. Drewry said frontloading tied to possible US tariff changes later in the year continued to absorb available capacity, and expects rates to remain firm with carriers' June increases now in view.
The Analysis
Three per cent, to $2,970. Shanghai to Los Angeles four per cent, to $3,650. Shanghai to Rotterdam three per cent, to $3,030. Four numbers in one release, and three of them are not the number that will appear on your invoice.
The composite is a basket. You do not ship a basket. Before it goes into a budget it has to be taken apart into a lane, a base and a date.
The explanation attached to it is frontloading ahead of possible US tariff changes later this year. That is a demand story wearing a capacity story's clothes, and which one it is decides whether the June increase holds.
$2,970 is an average of something the release does not itemise. Two of the three lanes it prints sit above the composite: Los Angeles 680 above it, Rotterdam 60 above it. That is arithmetic, not contradiction. If the visible lanes are above the average, the invisible ones are below. So 3% on the composite is not 3% of a market, it is a 4% lane, a 3% lane, and a set of lanes you were not shown that are moving more gently. If your cargo is transpacific eastbound you are living at the top of the range the composite averages away.
The weights are the missing denominator, and the release does not give them. Without weights the 3% cannot be rebuilt from the lane prints. Two shippers can read the same number and face 4% and 1.5%, and both will believe they are looking at the market. A composite's job is to be a headline. It is not a contract.
At the weekly scale it is $89 per 40ft. One week at $89 is noise; nobody renegotiates an agreement over $89. Persistence is the entire question, and it is exactly what a single print cannot tell you. Suppose the same weekly rate held for the eight weeks to the end of June, my assumption rather than Drewry's, and 3,650 compounds to 4,624 on Los Angeles. That is 974 a box more than today. The difference between 89 and 974 is not the rate, it is the number of weeks you allow it to run.
Put it on a unit or it stays abstract. A 40ft of consumer goods at $60,000 FOB carrying 3,000 units, both figures mine: freight per unit is $1.22. At 4,624 it is $1.54. Thirty-two cents on a unit that might wholesale at $20 is 1.6 points of landed cost, which is the honest size of a 27% freight move. Then divide by fill, because that is where the number hides. The rate is quoted per box, the cost is incurred per unit, and the bridge is your loading factor. The same 3,650 at 85% fill is $1.43 a unit, an 18% penalty that has nothing to do with the market and everything to do with how the cartons were packed. Budgets track the numerator, and the numerator is the one you can blame on an index.
The demand story deserves more attention than the rate. Frontloading ahead of a possible tariff change means the volume holding this rate up has already been booked and often already sailed; third-quarter cargo is on the water in May. A rise carried by pulled-forward demand is not the same object as a rise carried by tight capacity. The capacity is still there. The demand has moved rather than grown, and that kind of rise reverses without anything having to be added.
What the coverage leaves out is the base effect that follows. Pulling third-quarter volume into the second quarter does not only lift the second quarter; it inflates the base that every comparison from July onward is measured against. The market will read cooling in the third quarter even if the underlying level has not moved, and carriers reading that print will use it to judge whether June worked. A year-on-year comparison from August is the least informative number in this cycle and the one that will be quoted most.
Who feels it first is a direction-of-trade question before it is a size question. A small importer on spot, two or three boxes a week, gets the increase on the smallest base with no allocation to lean on and no annual contract to delay it; the invoice changes in the week of the effective date. A large importer on an annual contract is insulated until the anniversary and then reprices a year at once, a bigger number arriving later. An exporter shipping into Asia may see none of it, because a backhaul box is not the box this index describes.
Four clocks run at once. Spot quotes move within days, invoices on the effective date, contracts at renewal, shelf prices a quarter later if at all. The only one you can still act on is the invoice, and it is the only one with a date printed on it.
What decides this is not the rate, it is the asymmetry. Forty 40ft a month at 3,650 is $146,000. If the June increase lands near the drift above, 974 a box, which I derived from the stated percentages rather than read in the release, the same forty boxes cost 38,960 more a month and 116,880 across a quarter. Locking three months at today's number with a 2% premium costs 8,760, and that 2% is my assumption. One error is 8,760, the other is 116,880. Choosing between them does not need a forecast, it needs a view on which one you can survive.
An arithmetic trap sits in between. A June increase is a percentage of the June base, not today's. Writing it as 3% now plus the June increase adds where the market multiplies, and on a base already 27% higher, 8 points is 8 points on the larger number. The 8 is illustrative, the mechanism is not.
If the increase fails, the shipper who locked pays 2% for nothing and the spot buyer wins, which is a real cost and a small one. If it holds and you did not lock, you pay the drift on every box until the next window. One of those is reversible at the next sailing. The other is not reversible until the next contract.
The pitfall is comparing your invoice to the index. The invoice carries the lane rate, bunker, whatever peak surcharge is running and terminal handling at both ends; the index carries a lane rate. Benchmark all-in against 2,970 and you will conclude you are being robbed, and be wrong about the amount, which is worse than being wrong about the direction. The second pitfall is the monthly average: book on the week, budget on the month, and never let the two meet in one spreadsheet without a label.
Lock when the June quote for your sailing date is at or below the compounded drift, 4,624 on Los Angeles. Below that you are buying the drift at a discount. Above it you are paying for the peak twice, once in the rate and once in the premium.
An index is a good thermometer. Nobody has ever cooled a room by reading one.
↑ Back to the key points