Read this first — the conclusion, and the moves to make:
- By 6 February, pull your last twenty arrivals on Asia to North Europe and score them against the date you promised your customer, not the vessel ETA; report the result per string, not per trade.
- Before 31 March, rewrite every service commitment in your contracts to read in days port to port rather than by reference to the carrier proforma; a days clause is a claim, a proforma clause is a subscription.
- Set a monthly lane review on the first working day of each month comparing the trade reliability figure with your own door figure; a gap wider than ten points for two consecutive months means the lane has been re-based and your buffer is wrong.
- Size safety stock against the worst decile of arrivals over the last two quarters rather than the average, and re-cut it at the end of March.
- Where your exposure is a fixed delivery window, lock the buffer rather than the rate: book the extra days into the customer promise before the next proforma publication, and release them only after the spread has narrowed for two consecutive months.
Sea-Intelligence reported global schedule reliability steady in January as Cape-of-Good-Hope routings stabilised into a predictable pattern. Asia-North Europe posted the largest gain, though absolute levels stayed below pre-diversion norms.
The Analysis
Sea-Intelligence's January note reads like good news and is written like good news. Global schedule reliability held steady. Asia to North Europe posted the largest gain of any trade. Absolute levels, the same note says, are still below where they sat before the diversions began.
Three sentences, and only one of them is doing work. A reliability percentage has a numerator, a denominator and a definition of on time, and in this trade all three have been quietly rebuilt since the diversions started. Until we know which one moved, the word gain is a label rather than a finding.
So we take it apart, then put it back together in boxes per booking, which is the only unit a shipper can actually spend.
The facts run four sentences. Reliability was steady in January. Cape of Good Hope routings have stabilised into a predictable pattern. Asia to North Europe improved more than any other trade. The absolute level remains under the pre-diversion norm. Only the third sentence is about improvement. The fourth tells you what kind of improvement it is, and it is the sentence that should govern how you read the other three.
Reliability is a comparison, not a measurement. It counts how many arrivals landed inside the window the carrier published in its own proforma, then divides by the arrivals it counted. Nothing in that arithmetic is about your cargo. Move the window and the score moves without a ship leaving the berth. Change which arrivals enter the count and the score moves again. Both things have happened on this trade since the diversions began, and neither of them is visible in the sentence about the largest gain.
A steady reading has a dull cause, which is why it deserves more trust than a spiky one. A loop that calls the same ports in the same order, with buffers cut for the same leg lengths, throws an arrival spread that repeats week after week. Predictability is not something a carrier delivers. It is what remains once the routing stops being rewritten. The ships did not get faster in January. The plan stopped moving.
Who benefits depends on what they buy. A shipper with a fixed retail window is not buying transit time, it is buying the distribution of arrival dates, and what damages it is the tail rather than the mean. A shipper moving dense, low-value cargo that can sit for a month buys neither and will hear all of this as noise. In between sit the accounts that book once a quarter and never see a proforma, and they are the ones most likely to treat a steady percentage as a commitment.
The familiar misreading lets reliability and speed share one axis. They are two. Ten arrivals out of ten inside the window, on a rotation that now runs the long way round, is a better score and a worse outcome than eight out of ten on the rotation you had two years ago. A carrier can raise its reliability while every box you own arrives later than it used to. Both statements can be true in the same month, on the same service, and usually are.
Underneath the percentage sit three resets, and this is the part the note does not carry. The proforma itself was reissued around the Cape, so on-time now means on time against a longer plan, and a plan rebuilt to be achievable gets achieved more often; that is the arithmetic of moving your own goalposts and then scoring well against them. The population behind the count also changed, because carriers merged strings and blanked sailings through the period, so the January sample is not the 2023 sample. The metric stops at the first port of call, which leaves the feeder, the barge, the rail ramp and the truck outside it entirely. Three resets, one direction: measured against the experience of a shipper receiving cargo inland, all three flatter the number.
Which produces the thing you can feel and cannot prove. The trade figure and your own receiving performance have separated. A carrier can be punctual at Rotterdam and late at your warehouse on the same shipment, and both reports are honest, because they stop measuring in different places. The figure you can act on is not in the note. It is the one you compute from your own last twenty arrivals, scored against the date you gave your customer rather than the date the vessel was due.
Here is the sizing, and every level in it is mine rather than the note's. Take a shipper moving forty FEU a month into North Europe. Let reliability move from fifty-five to sixty per cent; the direction is the note's, the two levels are my assumption, not a figure from the source. Forty boxes at fifty-five per cent is eighteen late. At sixty per cent it is sixteen. Two boxes, out of forty, in a month. Give the late box an average miss of six days, also my assumption, and the exposure falls from a hundred and eight box-days to ninety-six. Twelve box-days saved, which is one box idle for twelve days, or twelve boxes idle for one.
Twelve box-days is either nothing or everything, and the headline is incapable of telling you which. On seasonal apparel it is the difference between full price and markdown. On industrial fasteners it is a line nobody reads in a report nobody circulates. Two shippers, same lane, same gain, opposite verdicts, and the percentage they were both handed says the same thing to both of them.
One clause moves with all of this and almost nobody reads it at signature. Plenty of service commitments are written by reference to the carrier's published proforma instead of a stated number of days. When the proforma is reissued around a longer rotation, the commitment continues to be met by definition, and the shipper agreed to that in advance in a schedule annex. If your agreement says days, you hold a claim. If it says proforma, you hold a subscription.
The timing is slower than the coverage suggests, and it moves on a monthly beat. A proforma change reaches you at the next booking cycle, the booking cycle reaches your warehouse at the next receiving plan, and the receiving plan reaches your customer at the next promise you make. Nothing in that chain turns in a week. Review the lane weekly and you will read noise; review it monthly and you will see a plateau, which is the accurate word for what January described.
Run the other branch for a moment. Had the Cape routing refused to settle, reliability would be lower and the spread wider, and the carrier would be under commercial pressure to shorten the rotation or move back to recover the score. A messy network is a network with a reason to change. A tidy one has no such reason, and that is the uncomfortable half of this story. The stabilisation that lifted the score is also the thing that removed the argument for restoring the shorter route. The number improved for the same cause that keeps your transit long.
The practical move is to stop tracking the index and start replacing it. Two numbers, both yours: the on-time rate measured at your door against the promise you made, and the spread between your worst decile and your median. The first tells you whether you are being served. The second tells you what the tail is charging you for inventory. Everything in the note is an average of somebody else's bookings.
Reliability is the only number in this business that can improve for two years while every box you own arrives later. Ours did. Not one arrived earlier.