← Back to Supply Chain Review Ocean Freight

Evergreen Plans Fleet Upgrades for 2026

Source: Evergreen · 2026-01-13 · 8 min read
中文

Supply Chain Action Points

Read this first — the conclusion, and the moves to make:

  1. By 20 January, request the off-hire schedule by vessel and by quarter, with yard start and end dates, TEU size and the string each ship belongs to; an annual fleet plan is not a substitute, because it cannot be checked.
  2. Before signature, split the quote into base rate and surcharge, and get the surcharge formula and its review frequency in writing; a contract with a fixed base and an open surcharge is not a fixed price.
  3. For any booking in the quarter that contains your carrier's dry-dock window, add seven days to the delivery promise and tell the receiving site four weeks ahead rather than when the roll happens.
  4. Put a cap on surcharge pass-through in the contract itself, as a stated percentage of the base, with a re-open trigger above it; an email exchange is not a cap.
  5. Rank your lanes by value per FEU and move the top twenty per cent onto named-vessel bookings instead of port-to-port allocations; one rolled container on a high-value lane costs more than the rate difference you negotiated.
Skip to the detailed analysis ↓
Summary

Evergreen planned fleet upgrades for 2026, taking newbuild deliveries and retrofitting vessels for emissions rules. The carrier said the investments support an orderly capacity plan without aggressive blanking.

The Analysis

A fleet announcement with no numbers in it is not a fleet announcement. It is a position. Evergreen's 2026 plan says newbuild deliveries arrive, older ships go into yards for the emissions rules, and the investment supports an orderly capacity plan without aggressive blanking. Two activities, one promise, zero figures.

The two activities carry opposite signs. A delivery adds slots on the day the ship enters service. A retrofit removes them for as long as the ship sits in the yard, and the removal is invisible in the schedule, because the ship was never scheduled to sail. The promise covers a third lever, blanking, which is what a carrier pulls when the first two do not cancel out.

So the release cannot be read, only priced. Which quarter does the capacity actually leave, what does the retrofit cost per TEU, and which line item carries that cost back to you. Those three questions have answers. None of them are in the announcement.

Take the facts as given first, because they are short. Evergreen planned fleet upgrades for 2026, taking newbuild deliveries and retrofitting vessels for emissions rules. The carrier said the investment supports an orderly capacity plan, and that it will not blank aggressively. The only quantitative statement in the release is the negative one, the thing that will not happen, and that is worth noticing on its own.

Deliveries are not a decision taken this year. A ship entering service in 2026 was ordered years earlier, under charters and financing that make late delivery expensive and early delivery impossible, and the arrival dates are already fixed against a demand forecast nobody can revise retroactively. Orderly capacity plan is therefore not a description of a choice about how much capacity to add. It is a description of an arrival timetable the carrier already knows. The real decision this year is narrower: what to do with tonnage that has already arrived. Deploy it, idle it, slow it down, or blank it. The release rules out the fourth, which tells you the carrier means to work the first three.

The retrofit is the part with real capacity consequences and the part no market statistic will record. A ship in a yard for emissions work is not a blanked sailing, a cancelled sailing or a rolled booking. It is absent from the pro-forma schedule before the schedule is published. The standard measure of capacity discipline, the share of scheduled sailings that gets voided, therefore records nothing at all. The capacity leaves and the index does not move.

The retrofit also creates a cost that must be recovered, and the recovery route is where an importer gets caught. Emissions hardware is capital spent on an existing asset with a finite remaining life, and carriers recover that kind of capital through a per-unit charge rather than through the base ocean rate, because a per-unit charge can be revised on notice and a contracted base rate cannot. What the charge is called depends on the carrier and the trade. The asymmetry does not: you negotiate the base, and the surcharge arrives afterwards.

Different buyers meet this differently. A large BCO with an annual contract and a named allocation negotiates base and surcharges together, and has the volume to ask what the formula is. An NVOCC buying slots never sees the formula; it sees a slot cost that moves and a market that will not accept the pass-through in the same week. A small shipper sees one number on one invoice and no way to tell which part of it moved. Direction of trade matters too. An importer books against a retail or production date and absorbs delay as inventory. An exporter books against a vessel cut-off and absorbs delay as a missed sailing, which is more expensive, because the next one is a week away.

Timing is plannable if anyone asks for it. Retrofit programmes get scheduled against the trading calendar rather than the fiscal one, because a ship in a yard earns nothing, and the least bad time to earn nothing is the weakest demand window. That concentrates the off-hire. A concentrated off-hire is a quarterly capacity event that averages out to nothing annually. You will meet it as a booking that rolls in the quarter the ships are away, on the strings with the oldest tonnage, because old ships get retrofitted first.

Two misreadings are common enough to name. The first treats newbuild deliveries as bearish, on the logic that more ships means more slots means softer rates, so wait and sign later. That logic holds in a year where deliveries are the only variable. In a year where deliveries and retrofits land together, the sign of the net is not derivable from a release with no numbers in it. The second treats no aggressive blanking as a commitment about capacity. It is a commitment about one lever. A carrier can hold the sailing count and still remove capacity by slowing ships down, and slow steaming is harder to see than a dry dock, because the sailing still appears in the schedule, just with a longer transit.

Here is what the coverage leaves out, and it is why this release deserves more than a paragraph. The retrofit programme is a capacity withdrawal that does not have to be blanked. The carrier gets the rate support of a blanking programme without paying the price of announcing one. Blanking is visible, counted weekly, irritating to shippers, and it invites the question of why the capacity was scheduled in the first place. Dry-docking is invisible, uncounted, and nobody asks. If you are modelling 2026 capacity from a blank-sailing rate, you are modelling the smaller half of the number.

Give it a shape. Every figure in this paragraph is mine, not the carrier's, and this is my assumption, not a figure from the source. Assume a programme touching twenty ships, each around 8,000 TEU, each out of service for thirty days. That is 600 ship-days, or 1.64 ship-years. Spread across the calendar it equals one and a half ships standing still for a year, roughly 13,000 TEU of average capacity, about a sailing and a half of a weekly string. Compress the same 600 ship-days into two quarters, which is what a programme built around a peak usually does, and in those six months you have 3.3 ships, or 26,000 TEU, not in the water at any moment. The annual average understates the quarterly effect by a factor of two, and the quarterly effect is the one your booking meets.

The capex is a smaller number, and worth doing because it shows where the argument will happen. Mine again: five million dollars a ship, ten years of remaining trading life, an 8,000 TEU ship doing twelve round voyages a year at ninety per cent utilization. Annual lift is about 173,000 TEU. Half a million a year of capital recovery over 173,000 TEU is roughly three dollars a TEU. Three dollars is not a crisis. Three dollars recovered through a surcharge you did not price, on a twelve-month contract, across 100,000 TEU of annual volume, is 300,000 dollars, and none of it shows in the rate you negotiated.

Run the alternative. Had the carrier absorbed the deliveries by blanking aggressively instead of retrofitting, the capacity would have left in a form you could see, on a schedule you could read, on dates you could plan against. You would have known in November that a March sailing was gone. The invisible version is better for the carrier's rate and worse for your planning, because the first signal is a rolled booking two days before cut-off, when the alternative routings are full too. There is a second counterfactual that matters more for the market. If retrofit off-hire sat inside the visible blank rate, the published capacity picture would look tighter, rates would firm earlier, and you would have had a reason to lock. That information gap is worth real money, and it runs one way.

A retrofit is mostly steel and yard time. The expensive part, for you, is that the yard list is not published. Ask for it in the first weeks of January, before the contract conversation starts, and ask by vessel and by quarter rather than as an annual fleet plan, because an annual plan is a number nobody can check and a quarterly off-hire list is a number anybody can. Once you have it, the lock point is not the rate. It is the surcharge formula, and the date it can be revised.

↑ Back to the key points

— By Vivian Zhao