Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 31 January, put a collar on the table in every transpacific negotiation: ceiling at $2,900 per FEU, floor at $2,500, and price the collar as a separate line so you can see what certainty costs.
- Model the contract at 60 FEU a month against a $200 per FEU adverse move before you sign; if the unhedged exposure passes $100,000 for the year, do not sign without a ceiling.
- From the week of 19 January, report the US west coast at $2,680 and North Europe at $2,330 as two lines, and track the $350 spread weekly rather than the composite.
- For spot cargo, take quotes with a written validity of at least 14 days and re-quote every Monday while the composite sits within 2% of $2,165.
- Book a review for the second week of March: if the composite has held above $2,165 for three consecutive weeks and the February filings were not rolled, lift the floor to $2,600 on any volume still open.
The Drewry WCI composite index moved -0.7% week-on-week to $2165 per 40ft container for the week ending 2026-01-14. Shanghai-Los Angeles held near $2680 and Shanghai-Rotterdam near $2330. Drewry said rates opened the year near the low end of the cycle as the transpacific contract season began.
The Analysis
Drewry put the composite at $2,165 per 40ft for the week ending 14 January, down 0.7% week on week. Shanghai-Los Angeles held near $2,680. Shanghai-Rotterdam near $2,330. Drewry's line is that rates opened the year near the low end of the cycle, with the transpacific contract season just starting.
A 0.7% move is $15 on a $2,165 index. That is not a market event, that is rounding. The event is the level, and the calendar it lands on. You are negotiating next year's transpacific contract in the same week the index prints near the bottom of the cycle, and the number you sign now is the number you live with for twelve months.
So we ignore the percentage and look at the two things it is hiding: the spread, and the window.
Start with the spread. $2,680 minus $2,330 is $350 per 40ft between the US west coast and North Europe in the same week. Both lanes are near the bottom of their range, which is exactly when a spread like that gets treated as normal. It is not normal. It is the shape of the network at low demand, and shape changes faster than level does. When demand returns, the west coast lane moves first and moves further, because that is where capacity is concentrated and where the blank sailings were deepest.
Why the level matters more than the change. A minus 0.7% print in mid-January is the market saying the post-peak correction has finished and nothing has replaced it yet. Carriers have two instruments left and neither shows up in a weekly index on the day it is used. Blank sailings hold the number where it is. Filings set the floor for the next negotiation. A quiet index in January is not an absence of activity; it is activity that has not reached the assessment yet.
The contract season is the whole point. Transpacific service contracts are normally negotiated in the first quarter for a spring start, and the reference everybody uses is the spot level during the negotiation, which right now is $2,680. Sign at that level with no collar and you have handed the carrier a free option: they collect the upside if the market spikes, you absorb the downside if it falls. Sign with a floor and a ceiling and you have bought certainty at a known price. The index does not tell you which of those two documents you signed.
Who is exposed. A BCO with a few hundred FEU a year on the transpacific is negotiating now and holds leverage it will not have in June, because the carrier needs the volume on the books before the season closes. An SME at 20 FEU a month has no contract, is quoted spot at $2,680, and is holding a validity that will not survive the first filing. A European importer sitting at $2,330 is on the cheap side of the spread and should not assume that survives the first capacity cut. The group that gets this wrong every year is the one waiting for the market to confirm a bottom. By the time the index confirms it, the contract window has closed and the only thing left to negotiate is the surcharge.
Transmission, because there are two clocks and most planning cycles model one. The contract signed in January governs from spring, so the cost lands in Q2 and the decision happens in Q1: a gap of months between the signature and the P&L. Spot cargo runs on a different clock. A filing on 1 February shows up in the invoice for a mid-February sailing and in your landed cost about a month after that. Two clocks running months apart, on the same budget line.
Here is the part the number hides. A cycle low is the worst moment to sign an index-linked contract without a collar, and the best moment to sign a fixed rate with a ceiling. That is not contrarian, it is arithmetic. From a cycle low, the downside is bounded by carrier cash cost, because nobody sails below it for long. The upside is bounded by nothing in particular. An index-linked deal with no cap gives you all of the downside and none of the upside, and it is the deal most likely to be offered to you in a week like this one, precisely because it looks cheap.
Ask for a collar before you ask for a discount. A carrier will trade a ceiling for committed volume far more readily at the bottom than at the top. The second thing nobody says out loud: the minus 0.7% is a weekly average of assessed spot rates, and assessments trail bookings. Your February invoice was priced in January, on a market that had already stopped falling.
Do the sum. Assume 60 FEU a month on the transpacific, which is a mid-sized importer, and assume the market moves $200 per FEU against you after the contract is signed. That is our assumption, not a forecast. Sixty boxes is $12,000 a month, $144,000 across the contract year. Now the collar. If you pay $40 per FEU for a ceiling at $2,900, that is $2,400 a month, $28,800 a year, and it caps the exposure at $220 per FEU, or $13,200 a month. The insurance costs about a fifth of the move it protects against. The maths is not subtle. The reason people skip it is that the premium is visible in January and the loss is hypothetical until June.
The other case is not hard to build. If demand comes back after the holiday and the blank sailings bite at the same time, $2,165 is the bottom, the next print is up, and anyone who signed a fixed contract at $2,680 without a ceiling looks clever while anyone who signed index-linked without a cap looks worse than clever. The condition that flips the conclusion is not the index. It is whether the February filings hold. If they hold for two weeks past the holiday, the bottom is in. If they get rolled, it is not, and the low print was a pause rather than a floor.
The mistake is treating 0.7% as information. It is noise sitting on top of a level that decides your year. The level says you are negotiating at the bottom of a cycle with a months-long lag to your P&L, and that is a timing problem, not a forecasting problem. $2,680 is the number we would work from: at or below it, sign volume and take the ceiling while it is cheap. Above $2,900 with no filing behind it, wait. The index will tell you what happened. It will never tell you what you signed.
↑ Back to the key points