← Back to Insights
Data note

Four Commodities That Get Stopped at the Border Most

2026-11-16 · Carpamann Supply Chain Co., Ltd.
中文

We indexed 19,097 destination records across 233 countries — prohibited goods lists, customs notes by commodity, policy alerts, size limits and hotlines. Then we counted which commodities get refused.

The answer is narrower than expected. Jewellery, art, alcohol and phones — four groups that account for 38% of every prohibition in the dataset.

What the numbers say

CommodityDestinations that prohibit itWhy it travels badly
Jewellery93 of 233Precious metal and stone control, theft risk, valuation disputes
Antiques and works of art69 of 233Cultural property law, export licences, authenticity valuations
Alcoholic beverages35 of 233Excise licensing, state monopolies, age restrictions
Mobile phones and accessories28 of 233Type approval, stolen-handset registers, encryption rules

Two more commodities are worth flagging because they are almost never refused outright but almost always need something: watches carry a restriction, permit or paperwork condition in 225 of 233 destinations, and prepaid phone cards in 222. A quote without that condition attached is an incomplete quote.

The asymmetry that surprises shippers

Pure prohibitions are rare. Only 587 of the 14,820 customs records classify as "prohibited". The far bigger category is conditionality: 2,751 records restricted, 1,689 requiring a permit, 662 telling the shipper to confirm before dispatch.

Around 58% of the customs notes say nothing is restricted. The other 42% is where money is lost — not because the goods were banned, but because the condition was discovered after the parcel left.

This is why destination research is not a compliance checkbox. It changes the price you should quote: a permit fee, a broker, a VAT rate, an inspection delay of two working days. Those are quoting inputs.

Where the rules are thickest

Count the restricted, permit and prohibited lines per destination and the map is uneven. Iran and Ukraine carry 64 each, Greece and Kuwait 56, Russia 52; Kuwait alone lists 139 prohibited goods lines, Iran 132, Egypt 107. Meanwhile 231 of 233 destinations publish at least one prohibition — there is no "easy country" in the strict sense.

For a shipper the practical read is simple: the thinner the published rule set, the more you rely on the destination's discretion. A short list is not a green light.

What to do with this

All of it is in the reference, filterable by country and commodity, with each record dated and linked to its source.

Check your next shipment

Open the destination reference, or send us the commodity and country and we will read it for you.

Open the reference Ask for a pre-check