Every export conversation eventually reaches the same question: will this actually clear in the destination country?
Freight quotes answer the price. They do not answer that question. The rules that stop a parcel are written by the importing country — a permit from a ministry, a banned commodity list, a maximum piece weight, a tax that must be paid before release. Most of that information exists, but it is scattered, in local languages, and updated without notice.
This page turns publicly published destination service rules into an English, filterable reference: what each destination prohibits, what needs a permit, what needs paperwork, and what will physically fit. It is a working tool, not an article about one.
Why destination rules decide the outcome
Shippers usually prepare documents for the country they are standing in. The shipment is judged in the country it lands in. That gap is the single most common cause of the three failures we see:
- Held at clearance — a permit that should have been obtained before arrival cannot be issued after it.
- Returned or destroyed — some destinations do not allow formal-entry goods to be returned at all, and unclaimed goods are destroyed on a timer.
- Charged twice — duty, VAT and clearance fees are assessed on the destination's valuation, not the invoice you optimised at origin.
None of these are courier failures. They are information failures, and they happen before the parcel is collected.
What is inside the reference
Five datasets, published by the carrier for 233 destinations, normalised into one structure. Every record keeps its original publication date so you can see how current it is.
| Dataset | Records | What it answers |
|---|---|---|
| Customs notes by commodity | 14,820 | Can I send this specific product to this specific country — and what will it need? |
| Prohibited goods | 3,715 | Which commodities the destination will not accept, in the carrier's own English wording. |
| Policy alerts | 103 | What changed recently: new fees, new declaration duties, new coding requirements. |
| Size and weight limits | 232 | Maximum shipment and piece dimensions and weights, as numbers. |
| Destination hotlines | 227 | Who to call in the destination country, from inside and from abroad. |
Three of those five are already machine-readable — the prohibited list carries official English commodity names, and the limits and hotlines are numbers. The customs notes are not: they are Chinese prose written for Chinese shippers. Those we summarised into English, keeping every figure, permit name and deadline, and linking each record back to the source note so nothing is lost in translation.
The 15-minute pre-shipment check
The reference is built for one workflow. Run it before you book, not after the shipment is refused.
- Set the destination. Country first — everything else filters around it.
- Read the prohibited list. If the commodity is there, stop. No permit fixes a prohibition.
- Check the commodity note. Look at the verdict before the text: permit required and confirm first mean work before dispatch; no restriction means the destination has published nothing against it.
- Match the physical limits. Enter your piece weight and dimensions — destinations you cannot physically serve drop out of the list.
- Save the record. Print the filtered view to PDF and attach it to the shipment file. If the destination disputes acceptance, you have the dated note you relied on.
The filterable reference
Filter by destination, commodity and verdict — or search across the text. Every view is a shareable link, so you can send a colleague or a client straight to the exact question.
How to read a restriction note
Carrier notes use cautious language, and the caution is meaningful. We reduce each note to one of six verdicts so you can triage in seconds:
One habit matters more than the rest: treat "contact the carrier at destination" as unresolved, not as approval. It appears in about 18% of the customs notes we indexed — 2,603 of 14,820 records. It is the carrier telling you the answer depends on quantity, value or end use — details only your consignee can confirm.
Six traps worth knowing by heart
- Payment cards into Egypt. Inactive cards must move as documents with no declared value (about USD 55). Declared as a parcel with value, expect 10% duty, 14% VAT and roughly USD 30 in clearance fees — with a USD 55 floor either way.
- Vapes into Australia. Prohibited, full stop: devices, liquids, disposable or not, and nicotine pouches. Business shipments need both an ODC import licence and TGA approval — neither is obtainable after arrival.
- Used phones into Sri Lanka. Approval from the Import & Export Control Department must be in hand before the shipment lands. Applications filed later are refused outright.
- Books into Italy. To a private individual: unrestricted. To a company: a VAT declaration is required once it travels as a parcel rather than as documents. Same book, two answers.
- Anything of Russian origin. Several destinations prohibit the goods by origin regardless of where they ship from. Origin, not routing, decides.
- Vietnam, from 16 November 2026. Every inbound and outbound express shipment — including documents — needs individual customs declaration, with a VND 10,000 fee per waybill. Consignee name, address, email, phone and ID or tax number must be complete at booking, or clearance stalls.
Where this reference stops
Three limits, up front — a reference that overpromises can mislead more than it helps:
- It summarises, it does not adjudicate. Final acceptance is decided by the destination customs authority and the carrier on the day of entry. We keep every record dated so you can judge how fresh it is.
- It is not an official carrier document. It is an independent English summary compiled by Carpamann from publicly published destination service rules. Commodity names on the prohibited list are reproduced in the carrier's own English wording.
- Coverage is uneven by design. Where a destination publishes nothing for a commodity, the record reads "no restriction reported" — which means exactly that, not "allowed".
Want a destination check before you book?
Send us the commodity, the destination and the piece weight — we will return a short written read on what the shipment will need.
Ask for a pre-check What destinations reject most