← Back to Supply Chain Review
Tag: draft restriction
6 article(s) tagged 'draft restriction'
中文
Panama Canal holds 14.78m draft limit as Cape reroutes strain capacity
2026-08-12 ·
Ocean Freight
Panama Canal holds 14.78m draft limit, about 35 daily transits
2026-08-11 ·
Ocean Freight
Panama Canal Cuts Max Draft to 14.78m From Aug 15, Lifting Asia-US East Coast Rates
2026-08-05 ·
Ocean Freight
Panama Canal Cuts Maximum Draft to 14.78m From Aug 15 as El Nino Squeezes Transits
2026-08-04 ·
Ocean Freight
Panama Canal tightens draft to 49.5 ft, more cuts planned through August
2026-07-20 ·
Ocean Freight
Panama Canal enforces deeper draft cuts amid El Niño drought
2026-07-16 ·
Ports & Infrastructure