Supply Chain Action Points
Read this first — the conclusion, and the moves to make:
- By 30 September, build a 24-month per-port-call ledger from your own records: vessel, berth, cargo, arrival date, anchorage days, berth days, laycan missed or met, and the reason recorded at the time. Target: 100 percent of calls on the pilot services entered, baseline stated as mean plus 50th, 90th and 95th percentile waiting days, and no comparison figure carried over from any supplier.
- By 15 October, fix the evaluation design in writing: treated calls, control calls with similar berth occupancy and seasonality, comparison window matched month for month against the prior year, and the single pre-registered primary metric. Target: control set covering at least 30 percent of call volume, with any change in either set logged publicly inside the team.
- Run shadow mode for eight to ten weeks with the system producing recommendations and no automated execution, then score it on latency, divergence and regret. Target: 95th percentile recommendation latency inside one hour of new information landing, divergence reported as a share of cases, and every regret case root-caused with the correction cost attached in dollars.
- Report these five numbers monthly on your own data: coverage as handled calls over eligible calls, 90th percentile anchorage wait in days, attributable days saved against the control set, warning lead time at the 90th percentile, and decision yield as alerts that changed a decision over alerts sent. Target: coverage 90 percent or above, attributable days saved above your own break-even line for two consecutive months before any expansion, and any metric below target escalating to the steering group within five working days.
- Name the fallback owner per shift with a 30-minute response time budget, and hold a four-hour game day each quarter with the system withdrawn without notice. Target: 100 percent of eligible calls covered by the manual process during every game day, plan degradation measured and under 15 percent versus the system-assisted baseline, and every exception recorded with the correction cost attached.
- Write the stop conditions into the contract before go-live: sensitivity loss to a freshness or confidence floor returns decisions to a human with no override available; two consecutive months below break-even, one month of coverage below 90 percent, or an override rate above 25 percent triggers a pause and a reopening of commercial terms. Target: all four conditions implemented in the workflow rather than in a slide, and audited once a quarter.
Chinese firms are deploying autonomous AI agents across logistics: Shangang Steel and Huawei launched a vessel-scheduling agent cutting anchorage waits to under 7 days, while a Shanghai maritime risk-monitoring multi-agent system flags port congestion and geopolitical shocks in real time.
The Analysis
Two items came out of China in the middle of August, and both arrived with a number attached. A steel maker working with a telecom equipment vendor put out a vessel scheduling agent and said anchorage waiting time comes down to under seven days. A maritime research institute in Shanghai put out a multi agent system that watches risk across global shipping lanes and says it picks up port congestion and geopolitical shocks in real time and pushes a warning out before anybody asks for it. I read both the way I read any claim about software touching physical operations, which is to say the claim is a hypothesis and my job, before money changes hands, is to turn it into something I can measure on my own ships at my own ports. Neither number is false. Neither number is usable yet. Seven days measured from what baseline, on which vessels, in which month. Real time meaning seconds or meaning six hours, and landing on whose desk.
Here is how I model it, and I suggest you model it the same way before you look at a demo. Think of the port as a queue. The server is the berth, the jobs are the vessels, the waiting line is the anchorage, and the waiting time is set by three things that have nothing to do with intelligence: how fast jobs arrive, how long each job holds the server, and how much slack the server has when arrivals bunch up. A scheduling agent does not pour a new berth.
What it can do is reorder the line, move a job to another server, or tell a vessel to slow down so it arrives when the queue is short instead of when it is long. That is a genuine lever, and its size is bounded. If the berth is busy ninety percent of the time, clever ordering buys you very little, because the binding constraint is capacity rather than sequence. Establish which of those two worlds your port actually lives in, and do it before anybody quotes you a price.
The second deployment is a different animal, and I want to keep them apart, because blending them is how budgets get approved for the wrong reasons. A monitoring system produces alerts. It does not produce decisions. Its value stays at zero until a human acts on one, and it goes negative when it produces alerts nobody acts on, because you have spent scarce planner attention and bought nothing back. So I do not evaluate that kind of system by asking how accurate it is in the abstract. I ask how much warning it gives me, what share of its warnings change a decision I would otherwise have made, and who is on the hook at two in the morning when the alert lands.
Start with the question that every pilot should have to answer before it gets a budget line, and that most never do: which decision stops being made by a person. In vessel scheduling the candidates are few and specific. Do I bid for this berth window. Do I instruct the master to slow steam. Do I divert to the alternative discharge port and truck the last leg. Today each of those is made by an operator with a spreadsheet, a phone, and a relationship with the port agent, under time pressure, with incomplete information. Write that sentence down. Name the decision, name who makes it now, name the clock they make it under, and name the artifact that comes out the other side. A proposal that cannot be hung on that sentence is showing you features, not a decision, and features do not show up in your operating cost.
Once the sentence exists, evaluation becomes refreshingly mechanical. You are swapping one policy for another, and policies have properties you can measure. Latency, from new information landing to a revised instruction going out. Divergence, meaning the share of cases where the new instruction differs from what the old policy would have said. And regret, meaning the share of instructions that later turned out wrong in a way somebody had to clean up. Those three measured on your own voyages tell you more than any benchmark deck, and none of them requires access to the model internals, which you will not get anyway.
Now take the seven days apart, because it is four claims wearing one coat. The first is the baseline. A reduction to under seven days only means something against a stated starting point on the same berth type, the same cargo, and above all the same season. Anchorage queues at bulk terminals move with weather and restocking cycles in ways that will deceive anybody running a three month pilot. If your trial runs from February into April and the comparison figure came out of the fourth quarter, most of your improvement is the calendar. Fix the comparison window before anything else, and where a supplier cannot state their own window, treat the number as advertising until they can.
The second claim hides in the statistic. Under seven days as a mean is a completely different product from under seven days at the ninetieth percentile, and operators do not live in the mean. They live in the two vessels a month that sat eighteen days and missed the laycan on the next fixture. Ask for the whole distribution, not the headline: the fiftieth, the ninetieth, the ninety fifth, and the worst observed. If the tail has not moved and the middle has, you have bought something that improves good days and leaves you exactly as exposed where it hurts. It may still be worth buying, but not at the same price, and not with the same confidence.
The third is the denominator, and it is the one people forget. Is that figure computed across every port call, or across the calls the agent actually handled. Human dispatchers have been quietly declining the ugly ones for a century, and software can learn the same habit. If the agent abstains when the queue is bad, or if operators flip back to manual whenever things get complicated, the automated subset will look superb and the blended fleet number will look ordinary. So carry coverage as its own KPI. Coverage is handled calls divided by eligible calls, and anything under ninety percent after eight weeks tells you the headline is describing a self selected sample rather than your operation.
The fourth is attribution, and this is where honest teams lose their nerve. A simple before and after on one fleet will not survive scrutiny, because too much moves at once. Fuel economics change the slow steaming calculus. A berth opens, or closes for maintenance. A competitor shifts volume to another port and your queue shortens for reasons that have nothing to do with you. The clean design is a control group, and it is more available than people assume. If you serve several ports or run several services, pick a comparison set with similar berth occupancy and similar seasonality and leave it on the old policy for the length of the pilot.
If your whole world is one route into one berth, you cannot randomise, and the honest move is to say so out loud rather than dress up a before and after as proof. In that case settle for a directional read, publish the month by month gap between treated and control units, note every change in either set, and price the uncertainty into what you are willing to pay.
Then the arithmetic, with every input flagged as my assumption and none of it taken from the article or any supplier. Replace each one with your own figure before you walk into a budget meeting. Assume a dry bulk fixture carrying one hundred and eighty thousand tonnes. Assume the all in daily cost of that vessel, hire plus fuel at service speed plus the overhead you allocate, comes to twenty five thousand dollars a day, which is my round number and not a rate I have quoted from anywhere. Assume your historical anchorage wait on that service is twelve days. Assume the improvement you can actually attribute, after stripping out seasonality and comparing against your control set, is five days. That is one hundred and twenty five thousand dollars a voyage. Assume twenty six voyages a year on the service, and you have a gross figure somewhere north of three million dollars a year.
Now shrink it, because it always shrinks. Assume you can defend half of it under review, which would already put you ahead of most post implementation reports I have read. That is one and a half million. Then ask which line of the profit and loss it lands on, which depends entirely on your chartering structure. Under a voyage charter the owner carries the time cost and you may never see a dollar of it. Under a time charter you carry it and every day saved drops through. On your own tonnage you carry it too, but you also have slow steaming available, and slow steaming costs no licence fee and no integration project. Work out where the money lands before you sign anything. A saving that lands on somebody else's accounts is a talking point, not a business case.
I am not going to invent a licence fee, because I do not have one and a made up price is worse than no price. Invert the question instead, which is a habit I would keep for every tool in this category. Whatever the annual cost comes to, the break even is that cost divided by twenty five thousand dollars of vessel days. A million dollars a year means you need forty attributable waiting days saved across the fleet annually to justify it. Three hundred thousand a year means twelve. Write that number on a card before the quote arrives, and read the quote with the card in your hand. It changes the conversation in a way that no amount of enthusiasm does.
Turn to the second system now, the risk monitor, and grade it on different axes, because alerting systems fail differently from schedulers. A scheduler fails by handing you a bad plan, which is loud and obvious. An alerting system fails by handing you alerts that change nothing, which is quiet, slow, and usually discovered eighteen months later when somebody notices the team muted the channel six months ago.
Three numbers define an alerting product, and suppliers volunteer none of them unless pressed. Warning lead time, meaning the gap between the alert arriving and the moment the thing it describes starts costing you money. Precision, meaning the share of alerts describing something that turned out real and material. Decision yield, meaning the share of alerts that changed a decision you would not have made anyway. Lead time without precision is spam. Precision without lead time is a news service, interesting at breakfast and useless by lunch. Decision yield is the only one that pays anybody, and it is the one nobody measures, because measuring it requires somebody to write down, per alert, what they actually did.
Put all three into acceptance criteria. As starting points rather than laws, I would write something close to this. Ninetieth percentile lead time of at least seventy two hours on congestion events, because below that most of your options have already expired. Precision above forty percent against your own log of material events, because below that operators learn to ignore it. Decision yield above fifteen percent, because below that you have bought a dashboard with a nicer interface. The right values are the ones your own operation can defend, so run two weeks in shadow mode, log every alert and every action, and set the thresholds from your data rather than from my suggestions.
Agree what counts as material, in writing, before you begin. Congestion only matters above a threshold, and the threshold belongs to your fleet rather than to the port. If you run handysize tonnage into a berth that loads capesizes and the queue is twelve deep, your exposure is not the operator's behind you. Express your threshold as a specific number of added waiting days, and convert days to dollars at the same twenty five thousand a day so every line of the scorecard carries one unit. Anything below the threshold is not a miss. It is noise, and the supplier should not be credited for it in either direction.
The phrase multi agent is what makes the second deployment harder to buy well, and worth slowing down on. More than one autonomous component means more than one failure mode, and worse, it means failure modes that interact, because one agent's output is the next agent's input. The pattern I lose sleep over is not a single component being wrong. It is one component being confidently wrong upstream and everything downstream treating that output as ground truth, which is how a small input error becomes a rerouting recommendation nobody can trace back to its source.
The engineering answer is unglamorous and it belongs in the contract. Require every component to emit a bounded output carrying a confidence, a staleness timestamp, and a pointer back to the inputs it used. If a component cannot tell you how old its inputs were, you cannot tell whether its recommendation was current, and in a congestion event six hours of staleness is the entire decision. Require an abstain behaviour as well. A system obliged to answer every question eventually answers the ones it should have declined, and abstention tracked as a KPI is the cheapest form of honesty available to you.
Ask what happens when components disagree, because disagreement is normal in a distributed system and the resolution policy matters more than the individual accuracy does. Insist that disagreement surfaces to the human instead of being averaged away, and insist that it is logged, because the rate of internal disagreement is your earliest usable signal that the ensemble is drifting out of calibration.
Then the part pilots most often skip: when the system is wrong, who catches it, how quickly, and with what authority. Every autonomous recommendation needs a named fallback decision maker, a stated time budget in which they must respond, and a manual alternative that is genuinely still available, meaning somebody remembers how to do the job and the inputs they need are still being collected. I have watched operations discover, eighteen months in and four hours into an outage, that nobody left could rebuild the plan by hand, and that day cost more than a year of licence fees.
Test this rather than assume it. Run a game day once a quarter. Take the system away for four hours with no warning beyond the two people running the test, and score what comes out the other side on two things: whether the fallback covered every eligible call, and how much worse the plan was, in the same waiting day units you use everywhere else. If nobody noticed because the day was quiet, run it again during a heavy week, because heavy weeks are the only ones where this matters.
Write the abort conditions down before you start, in language the team can see, and split them into two categories. Safety and integrity first. Any recommendation that collides with a navigation or terminal constraint, any case where source data fails a freshness check, any recommendation below the agreed confidence floor, all return to a human automatically, and no committee can override that. Economics second. If attributable days saved fall below break even for two consecutive months, or coverage drops below the floor for a month, or the override rate passes the level you set, halt the expansion and reopen the commercial terms instead of quietly continuing while hoping the curve turns.
On the commercial side I have no preference about whose logo ends up on the contract, and nothing above should be read as a recommendation for any company. What matters is where the measurement obligation sits. Insist on acceptance criteria stated against your own historical data with your own event labels rather than against the supplier's benchmark corpus. Pin the model version and require notice plus a re evaluation window when it moves, because a silent model update invalidates every number you collected last quarter. Require the audit log, every recommendation with its inputs, its timestamp, and what the operator did about it, exported in a format you own, because that log is the only thing that will let you compute any metric above six months from now. And secure the exit: your contributed data comes back to you, and the old planning process keeps running in parallel for a defined period.
None of this is scepticism about the category. Getting queue time out of a berth and getting earlier warning that a port is turning are both genuinely valuable, and both have been done badly for decades by people with fax machines and good relationships. What I am sceptical about is the sequence. Most operators buy first and go looking for a metric afterwards. Reverse it and the same money goes further. Model the queue, establish today's baseline on your own fixtures, name the decision you are replacing, set the thresholds before the price arrives, and keep a control set warm, so that when somebody asks in eighteen months whether it worked, your answer does not begin with the two words I think.