DHL Express has started a daily Shanghai-Bangkok-Bahrain-Brussels-Shanghai rotation flown by a Boeing 767 freighter with a 50-tonne maximum payload. It follows the opening of its expanded Shenzhen gateway at Bao'an International Airport, where 22,000 square metres of operating area - 2.6 times the old site - lifts daily handling to 900 tonnes, about three times previous throughput. South China shippers get faster links into Europe and the Middle East.